VPO.SAFE.3.1.02.高空作业Working at Heights - 图文(15)

来源:网络收集 时间:2025-09-16
导读: Level 2 Date: 31-12-2013 Version: 6 Chapter Document Number SAFETY Pillar Safety Fundamentals VPO.SAFE.3.1.02. Working at Heights Owner: VP Technical Approved: Validation Com. Page 38 of 39 Confident

Level 2 Date: 31-12-2013 Version: 6 Chapter Document Number SAFETY Pillar Safety Fundamentals VPO.SAFE.3.1.02. Working at Heights Owner: VP Technical Approved: Validation Com. Page 38 of 39 Confidential – proprietary information AB InBev ? Validation: What are the arrangements for making sure that the company safety advisor or other nominated competent person has reviewed, and is satisfied with, the system of work proposed? 验证:如何确保工厂安全专家或有关安全管理人员审阅并同意该工作方式? ? This is not an exhaustive checklist, these are general questions, particularly relevant to

low-pitch industrial roofs consisting of liner sheet, insulation layer and profiled metal top sheet. Non-standard or unusual systems will need further consideration. Always address risks specific to an individual site (eg the presence of overhead power lines).

? 此检查清单不是最全面的,仅仅涵盖了一般性的问题,仅仅涉及到由内衬材料、保温层和压型钢板表层组

成的小坡度工业屋面,如遇到非标准化的或特殊的屋面,则需根据具体情况进行风险分析。(如:架空的电缆) 屋脊 屋脊通风口 阴角

保温棉 屋面板

山墙顶 滴水线 山墙

斜屋面

泛水

斜屋檐

倾角边缘 屋檐下通风

屋檐

Annex 6: Guidance for fall protection inspection 附件6:防坠落指南

Annex 7: Safety requirements for new roofs 附件7:新屋面的安全防护要求

防水层

? AB InBev 31-05-2008 All rights reserved

Level 2 Date: 31-12-2013 Version: 6 Chapter Document Number SAFETY Pillar Safety Fundamentals VPO.SAFE.3.1.02. Working at Heights Owner: VP Technical Approved: Validation Com. Page 39 of 39 Confidential – proprietary information AB InBev

DOCUMENT HISTORY Version Author 1.0 Peter Copermans Geerd Jan Timmers Date Description of Version Main or important changes since previous version 1.1 1.2 06-10-2005 First definite version. Introduction of procedure QUAL.3.2.2.2 ES, Operational Standards Implementation Plan. 13-12-2005 Change of numbering in 4.16 OPS ES 6. Language checks + explanation of certain items. Hans Vanhorebeek 30.05.2006 New document owner VPO Safety Work Group (Armstrong C., Pagliotti H., Rogiers G., Copermans P.) 2 31-05-2008 3 Peter Copermans 31-12-2010 4 + 4B Peter Copermans 31-01-2012 5 6 Peter Copermans Peter Copermans 31-12-2012 31-12-2013 Initial Safety pillar. Split of Operational standards in separate procedure + review procedure. Include requirements for Stairs (5.A.8.), conveyers (5.A.9.) and Mobile steps (5.A.10.). Exceptions for work permit for own employees Specific roof works requirements Introduction double lanyard Guidance for inspection of height access inspection, annex 6 + 4B= additional requirements for access to unsafe roofs (A.11) and requirements with regards to works on fragile roofs + annex 7, Safety requirements of new roofs Requirements for scaffolding mounting Including Jupille best practice for blocking access on fix ladders Rephrase requirements for work permits etc for roof works ? AB InBev 31-05-2008 All rights reserved

…… 此处隐藏:764字,全部文档内容请下载后查看。喜欢就下载吧 ……
VPO.SAFE.3.1.02.高空作业Working at Heights - 图文(15).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/566399.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)