SECCO表格 - 图文
上海赛科90万吨乙烯工程
Shanghai SECCO 900KTPA Ethylene Project
单项(单元)工程: Work Item (Unit): 施工质量规则附表目录(一) PR-00-CIJ-QU-0002 Construction Quality Rules Annexed Table Index (I) 项目编号: Project No.: 表号 Table No. 表格名称 备注 √ -A01 -A02 Table Title Remarks 施工组织总设计报审表Review Request on Overall Construction 3 Organization Design 工程技术管理文件报审表Review Request on Engineering Technical 4 Management Document 5 6 7 -A03 分包单位资格报审表 Review Request on Qualification of Subcontractors √ -A04 -A05 单位工程开工报审表Review Request on Commencement of Work Unit 工程复工报审表Review Request for Resume of Work Request Request √ -A06 √ -A07 -A08 施工测量放线报验单 Construction Surveying and Setting Out Inspection 8 材料/构配件/设备报审表 Material/Component/Equipment Review 9 单位工程划分申报表 Work Unit Division Application Report 10 √ -A09 -A10 -A11 -A12 -A13 -A14 -A15 -A16 -A17 -A18 -B01 -B02 -B03 -B04 -B05 -B06 单位工程工序质量控制点申报表 Report Table of Work Procedure 11 Quality Control Points of Unit of Work 工序质量控制点核验通知 Work Procedure Quality Control Point 12 Inspection Notice (检验批)分项工程质量报验申请表 (Inspection Batch) Work Item Quality 13 Inspection Application 分部工程质量报验申请表 Work Section Quality Inspection Application 单位工程质量报验申请表Work Unit Quality Inspection Application 竣工测量报验申请表Completion Surveying Inspection Application 工程中间交工检验通知Intermediate Handover Inspection Notice 工程交工报验单Construction Takeover Inspection Request 事故报告单Accident Report 监理工程师通知回复单 Supervision Engineer Notice Response 监理工程师通知单 Supervision Engineer Notice Inspection and Acceptance Certificate 14 15 16 17 18 19 20 21-22 工序质量控制点检查认可书 Work Procedure Quality Control Point 23 工程中间交工证书Intermediate Handover Certificate 工程暂停令 Work Suspension Order 巡视旁站监理记录Patrol Supervision Record 会议纪要(一) (二)Minutes of Meeting (I)(2) 24 25 26 27-28
上海赛科90万吨乙烯工程
Shanghai SECCO 900KTPA Ethylene Project
单项(单元)工程: Work Item (Unit) 表号 Table No. -C01 -C02 施工质量规则附表目录(二) Construction Quality Rules Annexed Table Index (II)项目编号: Project No. 表格名称 Table Title 监理工作联系单 Supervision Correspondence 工程变更单Variation Order 抽检记录 Spot Inspection Record 29 30 备注 Remarks -C03 31 工程建设有关单位及主要人员(一)(二)(三)Main Parties 32-33 √ -C04 and Persons Involved in the Project (1), (2) and (3) -C05 工程承包单位及承包内容 Construction Contractor Info. And 34 Scope of Contract -D01 交工技术文件封面 Handover Technical Document Cover -D02 -D03 -D04 -D05 -D06 -D07 -D08 -D09 -D10 -D11 -D12 -D13 -D14 Technical Document Document 35 交工技术文件总目录 Master Table of Contents of Handover 36 交工技术文件目录 Table of Content of Handover Technical 37 交工技术文件说明 Note of Handover Technical Document 开工报告 Commencement Report 38 39 工程中间交接(机械竣工证书)Intermediate Takeover 40 (Mechanical Completion Certificate) 联动试运行合格证书 Linkage Commissioning Qualified 41 Certificate 工程交工证书 Project Takeover Certificate Certificate Upon Take-over of Work 42 交工技术文件移交证书 Technical Document Handover 43 未完工程项目明细表 Uncompleted Work List Remediation and Evaluation Report 44 重大质量事故处理鉴定报告 Major Quality Accident 45 工程联络单 Project Correspondence 设计变更一览表 Design Change Schedule 工程联络单一览表 Project Correspondence Schedule 46 47 48
上海赛科90万吨乙烯工程
Shanghai SECCO 900KTPA Ethylene Project A—01
单项(单元)工程: Work Item (Unit): 项目编号: 施工组织总设计报审表 Review Request on Overall Construction Project No.: Organization Design 编号:No. 致(监理单位) To (Supervision Company):上海市电力工程建设监理有限公司(SPESC
我方已根据施工合同的有关规定完成了 SECCO电厂原水处理区储罐 工程施工组织总 设计的编制,并经我单位上级技术负责人审查批准,请予以审查。 We’ve completed overall construction organization design for works of SECCO Electric Field Raw water treatment Tanks as per related requirements as specified in the Construction Contract, which has been reviewed and approved by competent technical leader in our company, we hereby submit it for your review. 附Attachment:施工组织总设计Overall Construction Organization Design 承包单位(章): 项目经理(签字): 日期: Contractor(Chop) Project manager(Signature): Date: 总监理工程师审查意见:Review remarks of Chief Supervision Engineer: 审查结论Review conclusion: □同意Approve □修改后再报To be resubmitted after revision □重新编制To be compiled again 项目监理机构(章): 总监理工程师(签字): 日期: Project supervision company(Chop): Chief supervision engineer (Signature): Date: 业主项目经理审批意见Review remarks of the Owner’s project manager: 审查结论Review conclusion: □同意Approve □修改后再报To be resubmitted after revision □重新编制To be compiled again 业主管理机构(章): 项目经理(代表): 日期: Owner’s management level (chop): Project manager (Representative): Date: 注:施工组织总设计审批意见中,特指的重大施工方案须经业主审批。 Note: Major construction method especially specified in review and approval remarks on overall construction organization design shall be also reviewed and approved by the Owner. 本表由承包单位填报,一式三份,经监理 …… 此处隐藏:5973字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [基础教育]2016-2022年中国钢芯铝绞线市场现状调
- [基础教育]语文部编版初一语文下册练习题 句式变
- [基础教育]南京继续教育参考答案--深入学习贯彻习
- [基础教育]国旗下讲话稿——珍惜时间好读书
- [基础教育]北师大版六年级数学下册圆锥的体积教学
- [基础教育]人教版-音乐-四年级下册-四年级下册音
- [基础教育]乔布斯2019年斯坦福大学毕业典礼致辞.d
- [基础教育]2015年加油站安全知识竞赛试题及答案
- [基础教育]2020年教师年度考核个人工作总结
- [基础教育]2019年中考历史试题-2019年大庆市初中
- [基础教育]初三仁爱英语第一轮总复习教案
- [基础教育]SG-A094电气配管安装工程隐蔽验收记录
- [基础教育]冀教版小学数学三年级下册第六单元教材
- [基础教育]青岛版(五制)小学科学二年级下册16《制
- [基础教育]2018-2019年初中科学初一中考真卷测试
- [基础教育]幼儿园大班期末简短评语精选
- [基础教育]2018云南临沧公务员考试申论技巧:这样
- [基础教育]学校食堂经营管理方案
- [基础教育]新中国砥砺奋进的七十年原文
- [基础教育]真空泵的选型及常用计算公式
- 高职田径课程教学现状与对策
- 全髋关节置换术在老年股骨颈骨折患者中
- 青人社厅函〔2016〕576号(附件)工资
- cp101-07砂子检验作业指导书 - secret
- 微观经济学 第八章 博弈论 习题
- 2014高考真题(词语运用)汇编及答案
- 2018年人教版七年级语文下册《第三单元
- 苏教版数学四年级上册第一单元试题 - M
- 四川大学新闻与传播考研2000-2010年真
- 浙江万里学院英语专业四年制本科教学计
- 最新2018马年事业祝福语-范文word版(2
- 最全模具行业术语英文翻译
- 皮亚杰的发展心理学理论
- 64篇高考情景式默写 练习题及答案
- 仿写(学生稿)
- 《SQL Server数据库技术》试卷A
- 第七章作业答案
- 江苏省赣榆县海头高级中学高中语文必修
- 浙江省2001年10月自考正常人体解剖学答
- 2012英语重点短语