采煤机英文标书 技术(4)
13.1 the bidder should open all the data concerned with purchase、erection、
inspection and commissioning for the buyer. No document shall be signed by the buyer.
13.2 The Seller shall supply to the End-user the acceptance standard for the
Goods one month before delivery of the Goods. The ex-work inspection certificate shall be supplied along with the equipment. After the equipment arrives at the site, the boxes of parts will be opened for accounting and inspection, the assembly of the equipments will take place and test run of the equipment will be carried out on the surface. The acceptance for all safety functions and operational functions on the equipment will be evaluated at this time. Then the memorandum of the acceptance on the surface will be signed. After operation underground for 500 meters of the face retreat or 45 days’ operation (which ever is early), both sides will sign the final acceptance memorandum.
13.3 Inspect content include system erection、commissioning、test running and
safety.
13.4 Acceptance standard:as-per the stipulation in contract and concerned
standard、China national standard、international standard and the standard approved by both sides.
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
14、Guarantee
The bidder should supply the guarantee period of Shearer Loader(total machine), as well as extend guarantee period of major parts (ranging arms、haulage gear boxes、electrical motors、inverters、haulage down drives、height adjustment cylinders and oil pump etc. ). The damaged components reasoned by default manufacture quality should be replaced free of charge, and the warrantee time should be postponed by correspond time.
15、Technical Support
15.1 The bidder should detail state the technical support measure, include within
and after the guarantee period.
15.2 Whether the bidder intend to build store in duty-keep area.
15.3 The 1st overhaul intervals should be taken after ____ ton coal production,
the cost for 1st overhaul is about ____ % of new Shearer Loader price (bidder should fill the blank)
16、Miscellaneous
16.1 Are there any effective measures for Shearer Loader design in order to
increase rate of the coal block?
16.2 Bidder should list the goods previously supplied and state the Shearer Loader run status by sheet.
16.3 It’s welcome that the bidder cooperate s with us in equipment maintenance
and provides technical support in maintenance.
16.4 W hat is the bidder’s suggestion to keep Shearer Loader works well and good
maintenances?
16.5 The b idder should supply “deviation form for technical specification”
16.6 Terms of payment. FOB 45 days before delivery, the amount of 100 % (one
hundred Percent) of the Contract Price for Goods shall be paid to the Seller in the form of a documentary irrevocable Letter of Credit ("L/C"). The payment of 80% (eighty percent) of the Price for Goods shall be made on presentation of the following documents: three (3) set of original shipped on board bills, certificate of origin, Commercial Invoice of 80% (eighty percent) of the Price for Goods, Quality Certificate issued by the manufacturer, Packing List, insurance(beneficiary to buyer), stated phytosanitary Certificate and relative original bills. The payment of Ten Percent (10%) of the Price for Goods shall be paid to the Seller out of the L/C against presentation of the following documents: Approved Design drawings by the relevant Authorities of MA and Commercial Invoice for 10% of the Goods.
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
Final Payment - Ten Percent (10%) of the Price for Goods shall be paid to the Seller out of L/C upon acceptance of the Goods against presentation of the following documents: Commercial Invoice for 10% of the Goods, The acceptance certificate signed by both of the Seller and the End User, One (1) Swift Format copy of an irrevocable Performance Bond covering ten percent (10%) of the price for the goods, issued by the Seller’s bank in favor of the Buyer.
16.7 Bids documents should be prepared strictly according to the stipulated
below.
Attachment 1:Geography Condition (Supplied By The Buyer)
Attachment 2:Delivery Time
Attachment 3:Scope of Supply
Attachment 4:Schedule of Prices
Attachment 5:Technical Specification
Attachment 6:Packing and Transportation
Attachment 7:Spare Parts and Consumables
Attachment 8:Supervision during Manufacture
Attachment 9:Training
Attachment 10:Erection、Commissioning And Test Running
Attachment 11:Design Liaison
Attachment 12:Inspection and Acceptance
Attachment 13:Warranty
Attachment 14:Technical Documents and Drawing
Attachment 15:Technical Support
Attachment 16:Miscellaneous
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
Attachment 1
Mine Condition
一、Overview
Sihe Coal Mine of Qinshui Coal field is located in Qinshui County, Shanxi Province. It is easily accessible with Jing-Yang Expressway about 15 km away and Jiafeng Railway Station of Hou-Yue Railway only 1 km. In addition, the mine has its own railway spur. The geological reserves of Sihe Mine amount to 3512.9 million tons, with Seam 3 having service life of 110 years. Three main and service slopes have been constructed for mine entry development. The main slope has a net width of 5.0 m, net cross section area of 15.5 square m, dipping angle of 16 degrees, oblique length of 749.3 m. In the main slope, 1400 mm wide belt conveyor is installed to convey the projected 4 million tons production per year from the east block. The west slope …… 此处隐藏:5714字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [小学教育]四年级综合实践活动课《衣物的洗涤》教
- [小学教育]2014半年工作总结怎么写
- [小学教育]20世纪外国文学专题综合试题及答案
- [小学教育]TS_1循环使用催化丙烯环氧化反应研究
- [小学教育]最实用的考勤签到表(上下班签到表)
- [小学教育]气候与生态建筑——以新疆民居为例
- [小学教育]二人以上股东有限责任公司章程参考样本
- [小学教育]2014届第一轮复习资料4.1,3美好生活的
- [小学教育]土方开挖、降水方案
- [小学教育]手绘儿童绘本《秋天的图画》(蜡笔)
- [小学教育]2002级硕士研究生卫生统计学考试试题
- [小学教育]环保装备重点发展目录
- [小学教育]金蝶K3合并报表培训教材
- [小学教育]岩浆岩试题及参考答案
- [小学教育]知之深爱之切学习心得
- [小学教育]第十二章 蛋白质的生物合成
- [小学教育]Chapter 2-3 Solid structure and basi
- [小学教育]市政道路雨季专项施工方案
- [小学教育]中国海洋大学2012-2013学年第二学期天
- [小学教育]教育心理学第3章-学习迁移
- 浅谈深化国企改革中加强党管企业
- 2006年中国病理生理学会学术活动安排
- 设计投标工作大纲
- 基于ARP的网络攻击与防御
- 2016届湖北省七市(州)教科研协作体高三
- Google_学术搜索及其检索技巧
- 2019-2020学年七年级地理下册6.3美洲教
- 城市道路可研报告
- 【名师指津】2012高考英语 写作基础技
- 6级知识点培训北京师范大学《幼儿智趣
- 注册会计师会计知识点:金融资产
- 新安装 500 kV 变压器介损分析与判断
- PS2模拟器PCSX2设置及使用教程.
- 医院药事管理与药剂科管理组织机构
- {PPT背景素材}丹巴的醉人美景,免费,一
- NAS网络存储应用解决方案
- 青海省西宁市六年级上学期数学期末考试
- 测量管理体系手册依据ISO10012:2003
- 洞子小学培养骨干教师工作计划
- 浅谈《牛津初中英语》的教材特点及教学