采煤机英文标书 技术(2)
*4.30 Easy to fill oil to haulage down drive should be taken into consideration
4.31 The Shearer Loader should have Face conveyor emergency-off function.
5、Detail Technical Parameter(the following is the content that the bidder should supply):
5.1 General parameter for Shearer Loader
⑥ Model of Shearer Loader:
⑥ The quality standard:
⑥ Outline dimension of Shearer Loader(outline drawing should be supplied):
Distance between drum center when ranging arm in horizontal position:
Distance between haulage sprockets:
⑥ Total installed power:
Input voltage of Shearer Loader:
Quantity and power of cutting motor:
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
Quantity and power of haulage motor:
Power of hydraulic unit:
power of the breaker motor:
⑥ Cutting height:
⑥ Undercut depth:
⑥ Effective cutting depth:
⑥ Style of haulage:
⑥ Speed of haulage:
⑥ Rated production capacity:
⑥ Machine body height from floor :
⑥ Clearance for coal passing(from the deck plate of AFC):
⑥ Machine weight:
⑥ Noise level:(dB)
⑥ Max. Cut ability of mineral:
⑥ Max. inclination in conveyor direction:
⑥ The bearing manufacturer:
⑥ Shearer working lifetime expected:
5.2 Cutting unit
5.2.1 Ranging arm
Quantity:
Transmission style and gear ratio:
Material of the shell:
Material and hardness of the gearwheels:
Lifetime of the gear(calculate according to the coal output quantity):
Output shaft rotation speed:
Adjustment of ranging arm height:
Ranging arm ranging angle(include up and down):
Length of ranging arm:
Protection style:
Max. designed power of ranging arm(under rated output rotary speed):
Method of lubrication and cooling of the ranging arm:
Planetary gearbox diameter:
Weight(without drum and cutting motor):
Lifetime(calculate according to the output coal quantity):
5.2.2 Cutting motor
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
Manufacturer and model of the motor:
Operating mode:
Rated voltage and frequency:
Rated current and start current:
Rated power:
Rated rotation speed:
Insulation:
Safety grade:
Cooling method:if water cooling, list the quantity and pressure of water:
Over-heat protection manner:
Over all dimensions and weight of the motor:
5.2.3 Cutting Drum
Type:
Dimension of drum:
line speed of the pick of drum:
connect manner between drum and ranging arm:
Thickness of drum body and helix vane:
Effective cutting depth:
Dust suppression system:
Water pressure, quantity and filtrate precision for dust suppression:
Estimated lifetime(under normal condition):
Weight:
The type and quantity of pick and pick holder:
Estimated wastage of picks(piece /10,000t):
5.3 Haulage unit
5.3.1 Parameter of haulage unit
Quantity of haulage unit:
Gearbox style and ratio of the haulage unit:
Haulage method:
Haulage speed(un-load and load speed):
Max. pulling force:
Rack wheel pitch:
Mechanical protection manner
Max. pulling force designed for haulage gear box and haulage down drive:
Lubrication and cooling manner:
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
Weight (without motor):
Estimated lifetime:
The following should be supplied in bid documents: the drawing of haulage
speed/pulling force, state the relation between force and speed when
haulage unit running.
5.3.2 Haulage motor
Manufacturer and model:
Operating mode:
Rated voltage and frequency:
Rated current and start current:
Rated power:
Rated rotation speed:
Insulation:
Safety grade:
Cooling method:if water cooling, list the quantity and pressure of water:
Over-heat protection manner:
Over all dimensions and weight of the motor:
5.3.3 Haulage down unit
Quantity:
Basic parameter of each gear:
Hardness of gear:
Gear material:
Ratio:
Lubrication manner:
Weight of haulage down unit:
Lifetime(calculated according to the output coal quantity):
5.3.4 Sliding shoes
Style:
Contact area:
Unit pressure:
Weight:
lifetime(calculated according to the output coal quantity):
5.4 lump-Breaker
5.4.1 The diameter、rotation speed、cut ability of mineral、total weight of the
breaker roller:
采煤机英文标书 技术
IFB NO: Section 8 Schedule of Requirements and Technical Specifications
5.4.2 Style and quantity of breaker pick:
5.4.3 Breaker ranging arm swiveling angle:
5.4.4 Style and ratio of the gear box.
5.4.5 Lubrication manner:
5.4.6 Breaker motor
Manufacturer and model:
Operating mode:
Rated voltage and frequency:
Rated current and start current:
Rated power:
Rated rotation speed:
Insulation:
Safety grade:
Cooling method:if water cooling, list the quantity and pressure of water:
Over-heat protection manner:
Over all dimensions and weight of the motor:
5.5 Hydraulic system
5.5.1 Motor
Manufacturer and model:
Operating mode:
Rated voltage and frequency:
Rated current and start current:
Rated power:
Rated rotation speed:
Insulation:
Safety grade:
Cooling method:if wate …… 此处隐藏:4716字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [小学教育]四年级综合实践活动课《衣物的洗涤》教
- [小学教育]2014半年工作总结怎么写
- [小学教育]20世纪外国文学专题综合试题及答案
- [小学教育]TS_1循环使用催化丙烯环氧化反应研究
- [小学教育]最实用的考勤签到表(上下班签到表)
- [小学教育]气候与生态建筑——以新疆民居为例
- [小学教育]二人以上股东有限责任公司章程参考样本
- [小学教育]2014届第一轮复习资料4.1,3美好生活的
- [小学教育]土方开挖、降水方案
- [小学教育]手绘儿童绘本《秋天的图画》(蜡笔)
- [小学教育]2002级硕士研究生卫生统计学考试试题
- [小学教育]环保装备重点发展目录
- [小学教育]金蝶K3合并报表培训教材
- [小学教育]岩浆岩试题及参考答案
- [小学教育]知之深爱之切学习心得
- [小学教育]第十二章 蛋白质的生物合成
- [小学教育]Chapter 2-3 Solid structure and basi
- [小学教育]市政道路雨季专项施工方案
- [小学教育]中国海洋大学2012-2013学年第二学期天
- [小学教育]教育心理学第3章-学习迁移
- 浅谈深化国企改革中加强党管企业
- 2006年中国病理生理学会学术活动安排
- 设计投标工作大纲
- 基于ARP的网络攻击与防御
- 2016届湖北省七市(州)教科研协作体高三
- Google_学术搜索及其检索技巧
- 2019-2020学年七年级地理下册6.3美洲教
- 城市道路可研报告
- 【名师指津】2012高考英语 写作基础技
- 6级知识点培训北京师范大学《幼儿智趣
- 注册会计师会计知识点:金融资产
- 新安装 500 kV 变压器介损分析与判断
- PS2模拟器PCSX2设置及使用教程.
- 医院药事管理与药剂科管理组织机构
- {PPT背景素材}丹巴的醉人美景,免费,一
- NAS网络存储应用解决方案
- 青海省西宁市六年级上学期数学期末考试
- 测量管理体系手册依据ISO10012:2003
- 洞子小学培养骨干教师工作计划
- 浅谈《牛津初中英语》的教材特点及教学