脚手架资料中英
环境、健康和安全标准(Scaffolding脚手架)
1. PURPOSE 目的
This procedure provides guidelines for the safe erection, inspection, use, and dismantling of scaffolding at Air Products Facilities worldwide.
本程序为全球AOCI工厂安全安装、检查、使用和拆卸脚手架提供了指导原则。
2. SCOPE 范围
This procedure applies to all personnel who erect, inspect, use, or dismantle scaffolding. Air Products plant personnel must ensure that all contractors engaged in any scaffolding activities shall comply with the provisions in this procedure.
本程序适用于从事安装、检查、使用和拆卸脚手架的所有人员。APCI工厂人员必须确保所有涉及脚手架工作的承包商都要执行本程序的条款。
3. SUMMARY 概要
3.1 Scaffold design and specification shall as a minimum follows the nationally recognized and approved standards of the country in which the
scaffold is erected. Where the requirements of this standard are different to the nationally recognized and approved standards, the most stringent standard will apply.
脚手架的设计和技术要求必须至少符合其安装地所在国的国家承认和批准的标准。如果本程序的标准与安装地所在国的国家承认和批准的标准不一致,应该执行更为严格的标准。
3.2 Scaffolds shall be inspected by competent qualified and certified
personnel prior to use, after inclement weather and any occurrence where the structure has been modified. Any individual that erects or disassembles a scaffold must be certified, and all users of scaffolding must receive the appropriate training. Contract personnel must present proof of the appropriate training and qualifications prior to working on any Air Products site.
使用前、因恶劣天气和其它原因导致其结构被修改后,脚手架都要经合格的胜任人员检查。安装和拆卸脚手架的任何人员都必须持有合格证,所有的脚手架使用人都必须接受相应的培训。在任何APCI 现场工作之前,承包商人员必须呈交相应的培训和资质证明。
3.3 Scaffolds shall only be erected and disassembled by competent
approved and qualified personnel. Proper provisions must be made for the safe
lifting of scaffold fittings, poles and boards. Lifting equipment must be designed to prevent the possibility of scaffold falling to grade in the event that the load snags or knots slip. Throwing and dropping equipment is strictly prohibited.
脚手架只准由经过批准并取得资格的胜任人员安装和拆卸。必须使用合适的设备来安全提升脚手架的配件、支柱和板材。提升设备的结构必须能够避免被提升物绊住或绳结打滑致使脚手架倾斜的可能。严禁使用抛和丢的设备。
3.4 Erected scaffolds exceeding 38m (125' feet) in height (or the national limits in the country of use) shall be designed by a registered professional engineer, or the local authority where applicable, and shall be constructed and loaded in accordance with such design.
安装高度超过38m (125英尺)(或安装地所在国的国家限制)的脚手架必须由注册专业工程师或当地授权机构设计,并且必须按规定的设计要求进行建造和负载。
3.5 The person(s) in charge of the activity, e.g., plant maintenance, construction, etc., shall ensure that any individual that has the authority and responsibility for the erection, inspection, and disassembly of scaffolding is competent to do so. The individual will be deemed competent after receiving suitable training by an approved scaffold training company or in-house expert and shall be documented.
负责这类工作的人(例如工厂维修人员、建筑人员等)必须确保有权利和责任从事脚手架安装、检查和拆卸的任何人员都必须胜任其工作。凡接受过经认可的脚手架培训公司或内部专家培训的人员均被认为合格,培训情况必须记录存档。
3.6 Scaffolds shall have guardrails, mid-rails, and toe boards installed on all open sides and ends of platforms.
在脚手架的所有开放侧和平台的端部,必须安装扶手、中间隔档和隔板。
3.6.1 Guardrails shall be installed no less than 970 mm (38\more than 1,140 mm (45\National Standard. There must not be a gap between guardrails, or between toe boards and guardrails, greater than 470 mm (18\
扶手的安装高度不得低于970 mm (38英寸)或高于1,140 mm (45英寸),中间安装一个隔档(或者按照国家标准的要求)。扶手之间不得有断开的间隙,隔板与扶手之间的间隙不得大于470 mm (18英寸)。
3.6.2 Toe boards shall be a minimum of 102 mm (4\must be secured to prevent movement. Toe boards are to be of wood construction, aluminum, or steel preformed to match the scaffold.
隔板高度最低为102 mm (4英寸)并且必须牢固固定以防活动。隔板必须是与脚手架匹配的预制木材、铝材或钢材结构。
3.6.3 In windy conditions and certain situations, netting must be placed
between the toe board and mid-rails (and top rails in some cases) to prevent materials, i.e. paper, rags, small tools; various materials from being blown off the scaffold decking and falling onto the ground exposing people below to fall hazards.
在多风环境中和某些条件下,必须在隔板和中间隔档(有时隔板与顶部隔档)之间安装防摔网,以便防止材料(例如纸张、破布、小型工具等各种材料)被风吹下平台,落到下方地面上的暴露人身上造成摔落危险。
3.7 Scaffolds must be erected on sound surfaces and base plates must be used at all times. Footing or anchorage for scaffolds shall be rigid, and capable of carrying the maximum intended load without settling or displacement.
Unstable objects such as barrels, boxes, loose brick or concrete blocks shall not be used to support scaffolds.
无论何时,脚手架都必须安装在牢固的地面上并且必须使用基础板。脚手架的地脚或固定地必须稳固,能够在承载预期最大负载的情况下不发生沉降或位移。不得用桶、箱、散砖或混凝土块之类的不稳定物体支撑脚手架。
3.8 All poles, legs, or uprights of scaffolds shall be plumb and rigidly braced to prevent swaying and displacement. Sufficient ties or raking shores shall be provided to ensure that the scaffold cannot fall awa …… 此处隐藏:6178字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [高等教育]公司协助某村精准扶贫工作总结.doc
- [高等教育]高二生物知识点总结(全)
- [高等教育]苏教版数学三年级下册《解决问题的策略
- [高等教育]仪器分析课程学习心得
- [高等教育]2017年五邑大学数学与计算科学学院333
- [高等教育]人教版七年级下册语文第四单元测试题(
- [高等教育]2018年秋七年级英语上册Unit7Howmuchar
- [高等教育]2017年八年级下数学教学工作小结
- [高等教育]湖南省怀化市2019届高三统一模拟考试(
- [高等教育]四年级下册科学_基础训练及答案教材
- [高等教育]城郊煤矿西风井管路伸缩器更换施工安全
- [高等教育]昆八中20182019学年度上学期期末考试
- [高等教育]项目部各类人员任命书
- [高等教育]上市公司经营水务产业的模式
- [高等教育]人教版高二化学第一学期第三章水溶液中
- [高等教育]【中考物理第一轮复习资料】四.压强与
- [高等教育]金坑水电站报废改建工程机电设备更新改
- [高等教育]高中生物教学工作计划简易版
- [高等教育]2017年西华大学攀枝花学院(联合办学)44
- [高等教育]最新整理超短爆笑英文小笑话大全
- 优秀教师继续教育学习心得体会
- 阳历到阴历的转换
- 留守儿童教育案例分析
- 华师17春秋学期《玩教具制作与环境布置
- 测速传感器新型安装装置的现场应用
- 人教版小学数学三年级下册第四单元
- 创业个人意向书
- 山东省潍坊市2012年高考仿真试题(三)
- [恒心][好卷速递]四川省成都外国语学校
- 多少人错把好转反应当成了病情加重处理
- 中外广播电视史复习资料整理
- 江苏省扬州市江都区宜陵镇中学2014-201
- 工程造价专业毕业实习报告
- 广西师范学院心理与教育统计
- aympkrq基于 - asp的博客网站设计与开
- 建筑业外出经营相关流程操作(营改增后
- 人治 德治 法治
- [精华篇]常识判断专项训练题库
- 中国共产党为什么要实行民主集中
- 小学数学第三册第一单元试卷(A、B、C