NE板链提升机使用说明书(2)

来源:网络收集 时间:2026-09-26
导读: 1、输送范围厂,该型斗提机即可提升一般粉状、颗料状和块状物料,又可提升磨琢性较大的物料,且物料温度最高可达到250℃。 Wide conveying application. It is applicable for elevating general powder, granular

1、输送范围厂,该型斗提机即可提升一般粉状、颗料状和块状物料,又可提升磨琢性较大的物料,且物料温度最高可达到250℃。

Wide conveying application. It is applicable for elevating general powder, granular and lump and even abrasive big lumps with the highest temperature of 250℃.

2 、输送功率小、节能,该系列提升机采喂料式进料,垂力诱异式卸料。既减少了不挖掘功,惰性功,又减少返料现象。

It is energy economical type with comparatively lower conveying power consumption. The series adopts feeding input and weighting guiding discharge, with reduction of non-digging power, inertia power and material return occurrence.

3 、输送能力大。该系列提升机最大输送量可达800m3/h。

High capacity. The highest capacity reaches 800m3/h.

4 、使用寿命长,提升机的喂料采用流入式,牵引链是高强度耐脚板链式链条,大大减小了磨拉磨损,提高了使用寿命,延长了大修期。

Long life operation. Flow-in feeding model and high strength, ware resistance plate chain as carrying member greatly reduce abrasion and increase operation life.

5 、运行平稳,操作方便。本机壳体折弯压型.保证了整机的刚性。驱动部分的大平台设计为操作维护提供了方便。

Stable operation with easy handling. The equipment casing is folding press formed with great strength.

6 、密封性好。该机无论是轴封、检视门的密封,还是焊接部位均采先进的设计和可靠的工艺,从而保证了整机的密封,减少了环境污染。

Good seal performance. Advanced design and reliable workmanship adopt in shatt seal, inspection door seal and welding points. The coniplete equipment has high seal performance with reduced environmental pollution.

二、提升机的技术规范 Technical Specifications

NE系列提升机的技术规范表

NE series bucket elecator technical specifications

三、提升机的结构及安装简图Structure and brief installation sketch

NE系列板链式提升机由上部区段、中部机壳、下部区段、运行部件、驱动装置、检修平台和吊架组成

1、上部区段:由头轴总成、上部机壳及卸料口组成。

Upper section composed of head axix assembly, apper caning with mits and discharging outlet.

2、中部机壳(首节中间节) L=2.5米,安装在上部区段下第一个中部机壳。

Middte caring (the first section) L=2.5m installed ordinarily at the first pitch under the upper section

3、中部机壳(标准中间节)L=2.5米。

Middte caring (standard) L=2.5m 4、中部机壳(带门中间节)L=2.5米。

Middte caring (with inspection door) L=2.5m

5、中部机壳(非标中间节)L=0.5米~2.8米。

Middte caring (non standard) L=0.5~2.8m 6、下部装置:安装有张紧紧置(料位开关、速度开关用户自定)

Lower installed: installed with tensioning device(level switches and sweep swith by customers)

7、运行部件:由料斗和套筒滚子链条组成,采取双排链。

Moving parts consist of buckets and sleeved

roller chain. adopt multi-row chain. 8、检修平台。

Maintenance platform.

9、驱动装置——采取Y系列电动机,通过液力偶合器、减速器和链传动减速器(温度开关用户自定)。

Adopting Y-series motors, is through fluip couplings ,chain driving reducer(the temperature switch by customers). 10、维修架。

Hanging racks.

四、提升机的搬运、安装和废品处理 Moving, installation and disposal

1、提升机的搬运、吊装 Moving and hoisting of the bucket elevator

本机按照GB n193一83 《 出日机械电!仪器仪表产品包装通川技术条件》

采用裸装形式,可用铲车吊车进行装卸。

The Cquipment is bare packcd according to GBn193一83“General technical conditions of packing for exported mechanical and electrical instruments and meters” with bottom fastened and sliding , easy to be moved by forklift and crane .

2、提升机的安装说明 Installation specification

2.1、安装前的准备工作 Prcparation before installation 在正式安装设备之前必须做好以下准备工作: The following nccd tobcdoncbcforeinstallation:

2.1.1、仔细阅读本手册和提升机安装总图,熟悉安装技术要求,按基础图检查基础尺寸是否符合要求。

Carefully read the manual and bucket elevator general installation drawing , get familiar with installation technical specifications and check basic measures according to the drawings .

2.1.2、对照安装总图和装箱清单清点零部件数量,检查其质量。

Check quantity and qua1ity of the parts compared with the genera1 installation drawings and packing list.

2.1.3、熟悉整机及部件的产品说明书,了解安装、调试方法、技术要求、注意事项,准备必要的安装工具(起吊用具、测量装置、扳手等)。

Get familiar with equipment manual and master the installation, testing and technical requirements, attention notes and necessary installation tools (hoisting , measurement and wrench tools, ctc ) 2.2、安装顺序 Inslallation order 2.2.1、斗式提升机是分若干部件出厂的,因此安装现场具体情况参照下面安装顺序把各部件预先运到世道的位置,根据安装总图,参照下列顺序进行安装:根据图纸在基础上安设地脚螺栓,将下部装置固定在基础上,并校平基准面(其上法兰面)。

The bucket elevator is delivered in several parts. Based on site conditions, please refer to the following order to place the parts to proper position and assemble them according to the general installation drawings: Place anchor bolts on the foundation according to the drawing and fasten the lower section on it. The level should be checked and corrected (upper surface of flange).

2.2.2、下部装置上按照要求(检视门中部机壳按工艺要求布置)逐一安装中部机

壳,可在各种机壳法兰连接处垫1-3mm密封材料。

Continuously install middle casing accordingly. 1-3mm seal material can be placed at flange connection.

2.2.3、中部机壳安装校准后,安装上部装置。一般情况下,用户应在上部或中部(间隔5-8m)需设置支撑装置。支撑装置应可靠地固定在附件的建筑上,并允许提升机在垂直方向上可自由伸缩。

After middle casing installed, checked and corrected, the upper section will be installed. Generally, in upper section or middle section (every 5-8 m) support unit should be set by the user. Support unit should be fastened firmly with the neighboring structure and keep bucket elevator flexible …… 此处隐藏:4585字,全部文档内容请下载后查看。喜欢就下载吧 ……

NE板链提升机使用说明书(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wenku/132554.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150份
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150份
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)