桥式起重机毕业设计外文翻译--龙门式起重机金属材料的疲劳强度预
毕业设计(论文)外文翻译
专 业 名 称 机械设计制造及其自动化
班 级 学 号
学 生 姓 名
指 导 教 师
填 表 日 期 2013 年 01 月 12 日
英文原文:
Fatigue life prediction of the metalwork of a travelling gantry
crane
V.A. Kopnov
P.O.Box 64,Eknteriuburg 620107,Russian
Received 3 April 1998;accepted 29 September 1998
Abstract
Intrinsic fatigue curves are applied to a fatigue life prediction problem of the metalwork of a traveling gantry crane. A crane, used in the forest industry, was studied in working conditions at a log yard, an strain measurements were made. For the calculations of the number of loading cycles, the rain flow cycle counting technique is used. The operations of a sample of such cranes were observed for a year for the average number of operation cycles to be obtained. The fatigue failure analysis has shown that failures some elements are systematic in nature and cannot be explained by random causes.卯1999 Elsevier Science Ltd. All rights reserved.
Key words: Cranes; Fatigue assessment; Strain gauging
1. Introduction
Fatigue failures of elements of the metalwork of traveling gantry cranes LT62B are observed frequently in operation. Failures as fatigue cracks initiate and propagate in welded joints of the crane bridge and supports in three-four years. Such cranes are used in the forest industry at log yards for transferring full-length and sawn logs to road trains, having a load-fitting capacity of 32 tons. More than 1000 cranes of this type work at the enterprises of the Russian forest industry. The problem was stated to find the weakest elements limiting the cranes' fives, predict their fatigue behavior, and give recommendations to the manufacturers for enhancing the fives of the cranes.
2. Analysis of the crane operation
For the analysis, a traveling gantry crane LT62B installed at log yard in the Yekaterinburg region was chosen. The crane serves two saw mills, creates a log store, and transfers logs to or out of road trains. A road passes along the log store. The saw mills are installed so that the reception sites are under the crane span. A schematic view of the crane is shown in Fig. 1.
1350-6307/99/$一see front matter 1999 Elsevier Science Ltd. All rights reserved.
PII: S 1 3 5 0一6307(98) 00041一7
A series of assumptions may be made after examining the work of cranes:
·if the monthly removal of logs from the forest exceeds the processing rate, i.e. there is a creation of a log store, the crane expects work, being above the centre of a formed pile with the grab lowered on the pile stack;
·when processing exceeds the log removal from the forest, the crane expects work above an operational pile close to the saw mill with the grab lowered on the pile;
·the store of logs varies; the height of the piles is considered to be a maximum;
·the store variation takes place from the side opposite to the saw mill;
·the total volume of a processed load is on the average k=1.4 times more than the total volume of removal because of
additional transfers.
2.1. Removal intensity
It is known that the removal intensity for one year is irregular and cannot be considered as a stationary process. The study of the character of non-stationary flow of road trains at 23 enterprises Sverdlesprom for five years has shown that the monthly removal intensity even for one enterprise essentially varies from year to year. This is explained by the complex of various systematic and random effects which exert an influence on removal: weather conditions, conditions of roads and lorry fleet, etc. All wood brought to the log store should, however, be processed within one year.
Therefore, the less possibility of removing wood in the season between spring and autumn, the more intensively the wood removal should be performed in winter. While in winter the removal intensity exceeds the processing considerably, in summer, in most cases, the more full-length logs are processed than are taken out.
From the analysis of 118 realizations of removal values observed for one year, it is possible to evaluate the relative
removal intensity g(t) as percentages of the annual load turnover. The removal data fisted in Table 1 is considered as expected values for any crane, which can be applied to the estimation of fatigue life, and, particularly, for an inspected crane with which strain measurement was carried out (see later). It would be possible for each crane to take advantage of its load turnover per one month, but to establish these data without special statistical investigation is difficult. Besides, to solve the problem of life prediction a knowledge of future loads is required, which we take as expected values on cranes with similar operation conditions.
The distribution of removal value Q(t) per month performed by the relative intensity q(t) is written as
where Q is the annual load turnover of a log store, A is the maximal designed store of logs in percent of Q. Substituting the value Q, which for the inspected crane equals 400,000 m3 per year, and A=10%, the volumes of loads transferred by the crane are obtained, which are listed in Table 2, with the total volume being 560,000 m3 for one year using K,.
2.2. Number of loading blocks
The set of operations such as clamping, hoisting, transferring, lowering, and getting rid of a load can be considered as one operation cycle (loading block) of the crane. As a result to investigations, the operation time of a cycle can be modeled by the normal variable with mean equal to 11.5 min and standard deviation to 1.5 min. unfortunately, this characteristic cannot be simply used for the definition of the number of operation cycles for any work per …… 此处隐藏:20845字,全部文档内容请下载后查看。喜欢就下载吧 ……
- 基于PLC控制的航空电镀生产线自动输送
- 中考预测课内外文言文对比阅读2
- 2018-2023年中国商业智能(BI)产业市场
- 中国金融体制改革研究2011new
- 外窗淋水试验方案
- 精益生产(Lean Production)
- 学校安全事故处置和信息报送制度
- Chapter 5 Human Resources Management
- 【小学数学】人教版小学六年级上册数学
- 初中数学解题方法与技巧
- 山东省创伤中心建设与管理指导原则(试
- 函数与数列的极限的强化练习题答案
- 10分钟淋巴按摩消脂
- 网络应急演练预案
- 服装设计入门基础知识
- 初二数学分式计算题练习
- (人教新课标)高二数学必修5第二章 数列
- 最新自主创业项目
- 北京大学 无机化学课件 4第4章 配合物
- 贸易公司业务管理制度