基于PLC的电梯控制系统文献
Intelligence Building
In 1980s the first intelligence mansion had been completed in America, then intelligence building has been a broadly taken attentions by the whole world. The concept of intelligence building has been put different meanings along with the development of society. The early stage intelligence building had been thought that it is equal to the intelligence mansion, but now the intelligence building not only includes the intelligence mansions but also involves intelligence residential districts. This paper mainly discusses one subsystem of intelligence building system: the elevator control system.
In intelligence residential districts the enterprise’s information managing system mainly takes charge of the things which related to the daily life, for example supervising the district equipments, managing vehicles, disposing critical situations and so on.The elevator supervising and control system is also necessary to the intelligence residential districts. How to make people feel safe, stable and comfortable and how to save energy resources and protect environments and so on are the basic requirements to the elevator control system.
PLC is a common industry control device. It is a special industry control computer which has the perfect function and simple frame. The PLC strong ability in interference and so on makes the elevator industry one after another to apply the PLC to the elevator control system, in order to replace the relay being used in traditional elevator control system. The Application of PLC in the elevator control system reduces the breakdown rate and efficiently improves the operating reliability of the elevator with safety. This paper mainly discusses the elevator control system’s working principles, the system’s software and hardware realization methods and so on.
The Working Principles of Elevator Control System are stated as follows: The spot control information is send into the PLC from the customer input devices firstly, then the PLC control cabinet is required to send out the control signal to drive the equipments according to the system demands. The elevator can then perform the homologous action according to the control request. There are velocity feedback devices in system, which adopt measure velocity generators to provide the elevator velocities and generally are installed in the tail of tow motors. So this is a feedback control system, which can improve the system’s control precision.
It is not necessary to do interface circuit in the elevator’s PLC control system. What we should do is to send the signals to PLC digital input terminals. The signals include inside and outside calling signals, floor location inspecting signals, limiting location signals, opening and shutdown the elevator door signals etc. The DC power which is provided to PLC can be used as indicator light power. The PLC output points can be directly used to control transducers for the purpose of electrical motor’s positive turn and reverse, stop and control each segment velocity and so on.
Moreover, input and output devices are needed in elevator control system, besides the PLC, system’s major control device.
The control cabinet is the control center, from which we can send out various control commands. The control cabinet often was installed in the elevator room. The electric devices and signal systems, for example the contactors, relays, capacitances, resistors, rectifiers and transformers etc, are centralized in the control cabinet. The Power of the control cabinet was
derived from control cabinet was delivered to tow electric motors. Others control lines and signal lines were separately sent to each floor junction.
The design includes two parts: hardware and software. The hardware design is the base of software. Considering that the control demands are relatively complex, we design the programs separately according to the control function. Furthermore, we follow the principle as follows: When the elevator is ascending, the ascending demands are prior to other demands.When the elevator is descending, the descending demands are prior to other demands. The Sequential Function Chart(SFC) is adopted during the boxes to form elevator’s executive circuitry design. It is a method specially used in industrial sequential control. The SFC method can describe the system’s working procedure in great detail.
When all SFC are drawn and I/O address lists are presented, we can convert the SFC to Ladder Diagram(LD). Considering the strict demands for time and for locked each other, we introduce working bits to remember working steps. We should write out the working bits control program, which can link together each step and make the pervious step as the next step restriction condition. Thus the actual outputs are the logic combination of these working steps.
The system program has been debugged completely at present. Simulated experiment enunciates that the design method is viable. Application of PLC in the elevator control system is an effective method. It can make the personnel of the industry management center to long-distance monitor and control the elevator in control center, to connect the elevator system with intelligence building industry management system by Ethernet or special-purpose network such as Lon Works. The elevator, but also can lower the elevator maintenance costs etc. It is one of the developing direction of intelligence building elevator control system.
Lift control system
Lift control system is used to manipulate each control process by managing such commands as running direction, car call, landing call, load signal, landing indication, safety protection.
Lifts in different applications have different load, speed and drive / control modes. Lifts in same application may also have different control mode. Whatever control mode is adopted, the objective is the same, to be spec …… 此处隐藏:6042字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [专业资料]《蜜蜂之家》教学反思
- [专业资料]过去分词作定语和表语1
- [专业资料]苏州工业园区住房公积金贷款申请表
- [专业资料]保安管理制度及处罚条例细则
- [专业资料]2018年中国工程咨询市场发展现状调研及
- [专业资料]2015年电大本科《学前教育科研方法》期
- [专业资料]数字信号处理实验 matlab版 离散傅里叶
- [专业资料]“十三五”重点项目-虎杖白藜芦醇及功
- [专业资料]2015-2020年中国竹木工艺市场需求及投
- [专业资料]国际贸易理论与实务作业五:理论案例分
- [专业资料]财政部修订发布事业单位会计制度
- [专业资料]BCA蛋白浓度测定试剂盒(增强型)
- [专业资料]工程进度总计划横道图模板(通用版)
- [专业资料]七年级地理同步练习(天气与气候)
- [专业资料]X光安检机介绍火灾自动报警系统的组成
- [专业资料]衢州市人民政府办公室关于印发衢州市区
- [专业资料]经济全球化及其影响[1]
- [专业资料]质粒DNA限制性酶切图谱分析
- [专业资料]国家安全人民防线工作“六项”制度
- [专业资料]劳动力投入计划及保证措施
- 电子账册联网监管培训手册
- 人教版语文七年级上第1课《在山的那边
- 对我区担保行业发展现状的思考与建议
- 平面四边形网格自动生成方法研究
- 2016年党课学习心得体会范文
- 如何设置电脑定时关机
- 全球最美人妖排行榜新鲜出炉
- 社会实践调查报告及问卷
- Visual Basic习题集
- 《鱼我所欲也》课件2
- 浙江省会计从业资格考试试卷
- 全遥控数字音量控制的D 类功率放大器资
- 鞍钢宪法与后福特主义
- 电表的改装与校准实验报告(1)
- 2014年高考理科数学真题解析分类汇编:
- Windows 7 AIK 的使用
- 风电场全场停电事故应急处置方案
- 化工原理选填题题库(下)
- 关于产学研合作教育模式的学习与思考
- 西安先锋公馆项目前期定位报告




