新职业英语土建英语Unit1
新职业英语 Unit 1 Feasibility Study
土 建 英 语
English for Civil Engineering
深圳职业技术学院应用外国语学院
Unit 11 Feasibility Study Unit Feasibility Study
1
Warming-up Reading A Listening Speaking
6 7 8
WritingSelf-evaluation Vocabulary and Structure Grammar
2 3 4
9
5
Reading B
10
The Greatest Building
< Back
Unit 1 Feasibility Study
Task 1
Task 2
Home
Unit 1 Feasibility Study
Task 1 The following is a flow chart of the feasibility study of a construction project. Fill in the missing words according to the Chinese meanings. The first letters are already given. 用地 L_________ U______ and se 设计费 esign D_________ F______ ee 可行性研究 easibility S______ F_________ tudy 建筑费用 ost C_________ onstruction C______ 市场营销费 M_________ C______ arketing ostNext > Home
Unit 1 Feasibility Study
Task 2 Look at the figure and then put the following items in order.
项 目 建 议 书项
→
可 行 性 研 究决
→
批 准策
立→
→
项阶 段
设 计 任 务 书项
→
设 计
→
施 工
→
交 付 使 用段
目
目2 □ □ 5 □ 4 7 □
实
施
阶
3 Approval of project proposal □ 1 Project proposal □ □ 6 Design 8 Delivery □
Feasibility study Design specifications Project authorized Construction
Unit 1 Feasibility Study
Reading A
Background Information Task 1 Text Task 2 Task 3
Task 4
Home
Unit 1 Feasibility Study
Reading A
Background Information 可行性研究报告 建筑工程可行性研究报告通常包括项目总述和背景、
项目的市场预测和分析、选址、总体设计方案、设备和物资采购、财务估算、经济评价、结论和建议等。
Home
Unit 1 Feasibility Study
Reading A
Task 1 Before reading the passage, see how much you know about a feasibility study of a construction project by answering the following questions.
1. Why do the builders need to make a feasibility study?2. Can you name three costs of a construction project?
Unit 1 Feasibility Study
Reading A
The Costs in a Feasibility StudyA feasibility study is the financial analysis ofall the costs and income revenue that indicates whether a project will produce a profit. A feasibility study goes through several stages. The first stage uses approximated figures available at the time
but further stages will require cost figures thathave been confirmed and finalized.
Unit 1 Feasibility Study
Reading A
When preparing a feasibility study for a new construction project, the first point is likely to be the cost and availability of the land on which you
propose to build. The tender, that is, the offer youmake for the land, will also have a number of associated costs for items such as legal charges,
stamp duty and utility charges, includingtransportation costs. There may be many other costs that will have to be considered.
Unit 1 Feasibility Study
Reading A
A further estimate will be required of the fe
es and associated costs for the building design. Bids from a number of architects will have been collected and the most cost-effective design selected. All these estimated costs must be added to the first stage of the feasibility report.
Unit 1 Feasibility Study
Reading A
The next major aspect to consider will be the construction costs. For example, if your project comprises ten town homes, you need to
calculate how much it will cost for buildingmaterials, wages and insurance. Contractors will be asked for estimates and the most reliable and
cost effective design selected, but it is wise, atthis stage, to include an extra percentage, say 10%, for non-specified costs.
Unit 1 Feasibility Study
Reading A
This type of feasibility study will also include the likely estimated marketing costs, such as advertising, printing of brochures and sales
commissions.
Unit 1 Feasibility Study
Reading A
Finally, depending on what percentage of the total cost will have to be borrowed, the cost of borrowing must be included. In other words, the
total amount of interest on the loans will have tobe paid, over the period until the buildings are sold.
Unit 1 Feasibility Study
Reading A
可行性报告中的费用可行性报告是对项目的所有成本和总收入所做的财务分析,用于判断一个项目是否可以盈利。完成一份可行性 报告一般需要经过几个阶段。第一阶段是利用当时已有的 大致数据,而后面的阶段是当各项成本数据都最终确定以 后进行。
Unit 1 Feasibility Study
Reading A
当为一个新的建筑项目准备可行性报告时,首先要考 虑可能是能否取得该项目用地以及用地费用。投标价格, 即为获得土地开出的价格,也包含其他相关费用,如法律
费用、印花税和公共事业收费,如交通费等。另外可能还有其他费用需要考虑在内。
…… 此处隐藏:2096字,全部文档内容请下载后查看。喜欢就下载吧 ……相关推荐:
- [教育文库]夜场KTV服务员的岗位职责及工作流程[1]
- [教育文库]企划、网络、市场绩效考核方案
- [教育文库]学党史、知党情、强党性--“党的基本理
- [教育文库]2016年高考物理大一轮总复习(江苏专版
- [教育文库]干部廉洁自律自查自纠的报告
- [教育文库]2010年北京大学心理学系拟录取硕士研究
- [教育文库]资金时间价值练习题及答案
- [教育文库]保护环境的心得体会
- [教育文库]英语角内容:英语趣味小知识
- [教育文库]档案收集与管理工作通知
- [教育文库]劳动规章制度范本范本
- [教育文库]高考物理一轮复习课后限时作业1运动的
- [教育文库]机械工艺夹具毕业设计195推动架设计说
- [教育文库]通用技术教学比赛说课稿2
- [教育文库]2018年四年级英语下册 Module 7 Unit 2
- [教育文库]第2章 宽带IP网络的体系结构
- [教育文库]九年级化学第五单元课题3《根据化学方
- [教育文库]小学英语六年级情态动词用法归纳
- [教育文库]甲级单位编制窑井盖项目可行性报告(立
- [教育文库]2016-2021年中国城市规划行业全景调研
- 高考英语听力十大场景词汇总结
- 全省领导班子思想政治建设座谈会会议精
- 人教版新课标高一英语提优竞赛试题 下
- 江西省2014年生物中考试题
- 长沙镇食品药品安全事故应急预案
- 《金刚石、石墨和C60》片段教学设计
- 福州教育学院(王旭东)
- 基于EDA音乐播放器的设计
- 9、古诗两首《夜书所见》《九月九日忆
- 小学语文课外阅读有效策略探讨
- 贵州文化产业发展成支柱产业的问卷调查
- 膀胱类癌的诊治体会(附3例报告)
- 发动机积碳产生的原因
- Configuring Code Composer Studio for
- 学生良好的心理素质如何培养点滴谈
- 46 电沉积法制备锂离子电池用硅-锂薄膜
- 美舍雅阁公司管理中各部门职责
- 去壳剥皮的小妙招
- 六自由度运动平台的仿真研究
- Pride and Prejudice(傲慢与偏见)




