ABB ACSM1-04 04Lx 55-160KW变频器安装说明
ABB ACSM1-04 04Lx 55-160KW变频器安装说明
ABB Drives
如需购买此产品欢迎联系重庆艾利顿自动化联系人:余经理 联系电话:18280227007
Quick Installation Guide
ACSM1-04/04Lx Drive Modules (55 to 160 kW)
English. . . . . . . . . . . . . . . . . . . . . 3Deutsch. . . . . . . . . . . . . . . . . . . 11Español. . . . . . . . . . . . . . . . . . . 19Français. . . . . . . . . . . . . . . . . . . 27Italiano. . . . . . . . . . . . . . . . . . . . 35Suomi . . . . . . . . . . . . . . . . . . . . 43Svenska. . . . . . . . . . . . . . . . . . . 51中文. . . . . . . . . . . . . . . . . . . . . . 59
3AFE68971853 REV DEffective: 20.02.2009
© 2009 ABB Oy. All rights reserved.
ABB ACSM1-04 04Lx 55-160KW变频器安装说明
如需购买此产品欢迎联系重庆艾利顿自动化联系人:余经理 联系电话:18280227007
3
Quick installation guide - ACSM1-04/04Lx
With ACSM1-04Lx, beware of hot coolant. Do not work on the cooling system until the pressure is lowered down by stopping the pumps. High-pressure hot coolant (max.
1000kPa, 55°C [145 PSI, 131°F]) is present in the cooling circuit when it is in operation.
Introduction
This guide contains the very basic information about the mechanical and electrical installation of the ACSM1-04/04Lx drive module (55 to 160kW). For complete documentation, see either ACSM1-04 Drive Modules (55 to 110kW) Hardware Manual (code:
3AFE68912130 [English]) or ACSM1-04Lx Liquid Cooled Drive Modules (55 to 160 kW) Hardware Manual (code: 3AUA0000022083 [English]) depending on drive type. Both are available at . In this guide, the manual is referred to as the Hardware Manual.
Planning the installation
The ACSM1-04/04Lx is an IP20 (UL open type) drive to be used in a heated, indoor controlled environment. The drive must be installed in clean air according to enclosure classification. Cooling air must be clean, free from corrosive materials and electrically conductive dust. See the Hardware Manual for detailed specifications. The maximum ambient air temperature is 40°C (104°F) at rated current. The current is derated for 41 to 55°C (104 to 131°F). The drive is suitable for use in a circuit
capable of delivering not more than 100,000 rms symmetrical amperes, 480V maximum. The cables located within the motor circuit must be rated for at least 75°C (167°F) in UL-compliant installations. Install a hand-operated input disconnecting device (disconnecting means) between the AC power source and the drive. The
disconnecting device must be of a type that can be locked to the open position for installation and maintenance work on the drive or the motor. The input cable must be protected with fuses or circuit breakers. Suitable IEC (class gG) and UL (class T) fuses are listed in the Technical data section of the Hardware
Manual. For suitable circuit breakers, contact your local ABB representative. For installation in the United States, branch circuit protection must be provided in
accordance with the National Electrical Code (NEC) and any applicable local codes. To fulfill this requirement, use the UL classified fuses. For installation in Canada, branch circuit protection must be provided in accordance
Safety instructions
WARNING! All electrical installation and maintenance work on the drive should be carried out by qualified electricians only.
Never work on the drive, the braking chopper circuit, the motor cable or the motor when input power is applied to the drive. After
disconnecting input power, always wait for 5 minutes to let the intermediate circuit
capacitors discharge before you start working on the drive, control cabling, motor or motor cable. Even when input power is not applied to the drive, externally supplied control circuits may carry dangerous voltages. Always ensure by measuring that no voltage is actually present.
A rotating permanent magnet motor can
generate a dangerous voltage. Lock the motor shaft mechanically before connecting a permanent magnet motor to the drive, and before doing any work on a drive system connected to a permanent magnet motor.
Quick installation guide - ACSM1-04/04Lx
ABB ACSM1-04 04Lx 55-160KW变频器安装说明
如需购买此产品欢迎联系重庆艾利顿自动化联系人:余经理 联系电话:18280227007
4
with Canadian Electrical Code and any applicable provincial codes. To fulfill this requirement, use the UL classified fuses. The drive provides overload protection in accordance with the National Electrical Code (NEC). See the appropriate Firmware Manual for overload protection settings.
Installing pipe connectors (ACSM1-04Lx only)
Slide the nut and the cutting ring onto the liquid inlet pipe marked coolant in. Ensure that the thicker end of the ring points toward the nut.
Mechanical installation
WARNING! If the drive is to be connected to an IT power system (i.e. ungrounded, or high-resistance-grounded [over 30 ohms] power
system), the internal EMC filtering of
the drive must be disconnected. This should be done before the drive is mechanically installed. Refer to the Hardware Manual for detailed instructions.
Fasten the drive module to the mounting base using four screws through the four mounting holes.
Place the union body of the connector onto
the end of the pipe.
Quick installation guide - ACSM1-04/04Lx
ABB ACSM1-04 04Lx 55-160KW变频器安装说明
如需购买此产品欢迎联系重庆艾利顿自动化联系人:余经理 联系电话:18280227007
5
Tighten the nut to the union body, leaving 2…3 mm of thread visible.
Overtightening may cause leaking.
2…3
mm
Electrical installation
Supply (input) wiring diagram
Repeat the steps for the outlet pipe.
Motor (output) and resistor wiring diagram
相关推荐:
- [外语考试]管理学 第13章 沟通
- [外语考试]07、中高端客户销售流程--分类、筛选讲
- [外语考试]2015-2020年中国高筋饺子粉市场发展现
- [外语考试]“十三五”重点项目-汽车燃油表生产建
- [外语考试]雅培奶粉培乐系列适用年龄及特点
- [外语考试]九三学社入社申请人调查问卷
- [外语考试]等级薪酬体系职等职级表
- [外语考试]货物买卖合同纠纷起诉状(范本一)
- [外语考试]青海省实施消防法办法
- [外语考试]公交车语音自动报站系统的设计第3稿11
- [外语考试]logistic回归模型在ROC分析中的应用
- [外语考试]2017-2021年中国隔膜泵行业发展研究与
- [外语考试]神经内科下半年专科考试及答案
- [外语考试]园林景观设计规范标准
- [外语考试]2018八年级语文下册第一单元4合欢树习
- [外语考试]分布式发电及微网运行控制技术应用
- [外语考试]三人行历史学笔记:中世纪人文主义思想
- [外语考试]2010届高考复习5年高考3年联考精品历史
- [外语考试]挖掘机驾驶员安全生产责任书
- [外语考试]某211高校MBA硕士毕业论文开题报告(范
- 用三层交换机实现大中型企业VLAN方案
- 斯格配套系种猪饲养管理
- 涂层测厚仪厂家直销
- 研究生学校排行榜
- 鄱阳湖湿地景观格局变化及其驱动力分析
- 医学基础知识试题库
- 2010山西省高考历年语文试卷精选考试技
- 脉冲宽度法测量电容
- 谈高职院校ESP教师的角色调整问题
- 低压配电网电力线载波通信相关技术研究
- 余额宝和城市商业银行的转型研究
- 篮球行进间运球教案
- 气候突变的定义和检测方法
- 财经大学基坑开挖应急预案
- 高大支模架培训演示
- 一种改进的稳健自适应波束形成算法
- 2-3-鼎视通核心人员薪酬股权激励管理手
- 我国电阻焊设备和工艺的应用现状与发展
- MTK手机基本功能覆盖测试案例
- 七年级地理教学课件上册第四章第一节




