FIDIC设计采购施工(EPC)合同条件(银皮书英文版)(6)
They shall not, without the Employer’s consent, be copied, used or communicated to a third party by the Contractor, except as necessary for the purposes of the Contract.
1.12 Confidential Details
The Contractor shall not be required to disclose, to the Employer, any information which the Contractor described in the Tender as being confidential. The Contractor shall disclose any other information which the Employer may reasonably require in order to verify the Contractor’s compliance with the Contract.
1.13 Compliance with Laws
The Contractor shall, in performing the Contract, comply with applicable Laws. Unless otherwise stated in the Particular Conditions:
(a) the Employer shall have obtained (or shall obtain) the planning,
zoning or similar permission for the Permanent Works, and
any other permissions described in the Employer’s
Requirements as having been (or being) obtained by the
Employer; and the Employer shall indemnify and hold the
Contractor harmless against and from the consequences of
any failure to do so; and
(b) the Contractor shall give all notices, pay all taxes, duties and
fees, and obtain all permits, licences and approvals, as
required by the Laws in relation to the design, execution and
completion of the Works and remedying of any defects; and
the Contractor shall indemnify and hold the Employer
harmless against and from the consequences of any failure to
do so.
1.14 Joint and Several Liability
If the Contractor constitutes (under applicable Laws) a joint venture, consortium or other unincorporated grouping of two or more persons: (a)
(b) these persons shall be deemed to be jointly and severally liable to the Employer for the performance of the Contract; these persons shall notify the Employer of their leader who
shall have authority to bind the Contractor and each of these
persons; and
the Contractor shall not alter it’s composition or legal status
without the prior consent of the Employer. (c)
2 The Employer
2.1 Right of Access to the Site
The Employer shall give the Contractor right of access to, and possession of, all parts of the Site within the time (or times) stated in the Particular Conditions. The right and possession may not be exclusive to the Contractor. If, under the Contract, the Employer is required to give (to the Contractor) possession of any foundation, structure, plant or means of access, the Employer shall do so in the time and manner stated in the Employer’s Requirements. However, the Employer may withhold any such right or possession until the Performance Security has been received.
If no such time is stated in the Particular Conditions, the Employer shall give the Contractor right of access to, and possession of, the Site with effect from the Commencement Date.
If the Contractor suffers delay and/or incurs Cost as a result of a failure by the Employer to give any such right or possession within such time, the Contractor shall give notice to the Employer and shall be entitled subject to Sub-Clause 20.1 [Contractor’s Claims] to:
(a) an extension of time for any such delay, if completion is or will
be delayed, under Sub-Clause 8.4 [Extension of Time for
Completion], and
payment of any such Cost plus reasonable profit, which shall
be added to the Contract Price. (b)
After receiving this notice, the Employer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine these matters.
However, if and to the extent that the Employer’s failure was caused by any error or delay by the Contractor, including an error in, or delay in the submission of, any of the Contractor’s Documents, the Contractor shall not be entitled to such extension of time, Cost or profit.
2.2 Permits, Licences or Approves
The Employer shall (where he is in a position to do so) provide reasonable assistance to the Contractor at the request of the
Contractor:
(a) by obtaining copies of the Laws of the Country which are
relevant to the Contract but are not readily available, and
for the Contractor’s applications for any permits, licences or
approvals required by the Laws of the Country:
(i) which the Contractor is required to obtain under
Sub-Clause 1.13 [Compliance with Laws],
for the delivery of Goods, including clearance through
customs, and
for the export of Contractor’s Equipment when it is
removed from the Site. (b) (ii) (iii)
2.3 Employer’s personnel
The Employer shall be responsible for ensuring that the Employer’s Personnel and the Employer’s other contractors on the Site:
(a) co-operate with the Contractor’s efforts under Sub-Clause 4.6
[Co-operation],and
take actions similar to those which the Contractor is required to
take under sub-paragraphs (a), (b) and (c) of Sub-Clause 4.8
[Safety Procedures] and under Sub-Clause 4.18 [protection of
the Environment]. (b)
2.4 Employer’s Financial Arrangements
The Employer shall submit, within 28 days after receiving any request from the Contractor, reasonable evidence that financial arrangements have been made and are being maintained which will enable the Employer to pay the Contract Price (as estimated at that time) in accordance with Clause 14 [Contract Price and Payment]. If the Employer intends to make any material change to his financial arrangements, the Employer shall give notice to the Contractor with detailed particulars.
2.5 Employer’s Claims
If the Employer considers himself to be entitled to any payment under any Clause of these Conditions or otherwise in connection with the Contract, and/or to any extension of the Defects Notification Period, he
shall give notice and particulars to the Contractor. Howev …… 此处隐藏:5669字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [实用文档]李践-有效提升销售的12大黄金法则8-大
- [实用文档]党支部换届工作方案
- [实用文档]2013年下期电子商务专业部宣传工作计划
- [实用文档]方庄一矿通风、钻探绩效工资考核管理办
- [实用文档]项目一 认识企业物流认识企业物流
- [实用文档]MBI_Display_产品蓝图规画
- [实用文档]北京市建筑业劳务作业人员普法维权培训
- [实用文档]锅炉燃烧调整与运行优化
- [实用文档]4支付结算业务的核算
- [实用文档]米什金_货币金融学_第9版各章学习指导
- [实用文档]水泥混凝土路面硬化工程施工组织设计
- [实用文档]钢筋工程安全技术交底书
- [实用文档]关于公布华中师范大学本科毕业论文
- [实用文档]太原市园林绿化施工合同范本 2
- [实用文档]周日辅导 初中英语分类复习单项选择题(
- [实用文档]第四章 文化经纪人的管理形式 第二节
- [实用文档]学宪法讲宪法竞赛题库
- [实用文档]《数值计算方法》期末考试模拟试题二
- [实用文档]爱词霸学英语:每日一句( 十月)
- [实用文档]2014年国家公务员面试:无领导小组讨论
- 新课程主要理念和教学案例分析汇编(24
- 英国人的快乐源于幸福的家庭生活
- 七年级上册第一次月考模拟数学试卷
- 真丝及仿真丝的种类有哪些?
- 【最新】华师大版八年级数学下册第十六
- 高中英语3500个必背单词
- 我可以接受失败,但我不能接受放弃!
- 最近更新沪科版八年级物理上册期末试卷
- 绿化工作先进乡镇事迹材料
- 鲁教版九年级上册思想品德教学计划
- 英语音标的分类
- 地下室底板无梁楼盖与普通梁板结构形式
- 美容师黄金销售话术
- 雅思写作满分作文备考方法
- 血清甲状腺激素测定与高频彩色多普勒超
- 1度浅析装修对室内空气品质的影响
- 2017-2022年中国汞矿行业深度分析与投
- 计算机二级VB公共基础知识
- (何勇)秸秆禁烧_重在寻找出路
- 内外墙抹灰工程分包施工合同1