FIDIC设计采购施工(EPC)合同条件(银皮书英文版)(4)
1.1.1.2 “Contract Agreement” means the contract agreement
referred to in Sub-Clause 1.6 [Contract Agreement], including
any annexed memoranda.
1.1.1.3 “Employer’s requirements” means the document entitled
employer’s requirements, as included in the Contract, and
any additions and modifications to such document in
accordance with the Contract. Such document specifies
the purpose, scope, and/or design and/or other technical
criteria, for the Works.
1.1.1.4 “Tender” means the Contractor’s signed offer for the Works
and all other documents which the Contractor submitted
therewith (other than these Conditions and Employer’s
Requirements, if so submitted), as included in the Contract.
1.1.1.5 “Performance Guarantees” and “Schedule of payments”
mean the documents so named (if any), as included in the
Contract.
1.1.2 Parties and Persons
1.1.2.1 “Party” means the Employer or the Contractor, as the context
requires.
1.1.2.2 “Employer” means the person named as employer in the
Contract Agreement and the legal successors in title to this
person.
1.1.2.3 “Contractor” means the person(s) named as contractor in the
Contract Agreement and the legal successors in title to this
person(s).
1.1.2.4 “Employer’s Representative” means the person named by
the Employer in the Contract or appointed from time to time by
the Employer under Sub-Clause 3.1 [ the Employer’s
Representative], who acts on behalf of the Employer.
1.1.2.5 “Contractor’s Representative” means the person named by
the Contractor in the Contract or appointed from time to time
by the Contractor Sub-Clause 4.3 [the Contractor’s
Representative], who acts on behalf of the Contractor.
1.1.2.6 “Employer’s Personnel” means the Employer’s
Representative, the assistants referred to in Sub-Clause 3.2
[Other Employer’s Personnel] and all other staff, labour and
other employees of the Employer and of the Employer’s
Representative; and any other personnel notified to the
Contractor, by the Employer or the Employer’s Representative,
as Employer’s Personnel.
1.1.2.7 “Contractor’s Personnel” means the Contractor’s
Representative and all personnel whom the Contractor utilizes
on Site, who may include the staff, labour and other
employees of the Contractor and of each Subcontractor, and
any other personnel assisting the Contractor in the execution
of the works.
1.1.2.8 “Subcontractor” means any person named in the Contract as
a subcontractor, or any person appointed as a subcontractor,
for a part of the Works; and the legal successors in title to
each of these persons.
1.1.2.9 “DAB” means the person or three persons so named in the
Contract, or other person(s) appointed under Sub-Clause 20.2
[Appointment of the Dispute Adjudication Board] or
Sub-Clause 20.3 [Failure to Agree Dispute Adjudication
Board].
1.1.2.10 “FIDIC” means the Federation International des
Ingenieurs-Conseils, the international federation of consulting
engineers.
1.1.3 Dates ,Test, Periods and Completion
1.1.3.1 “Base Date” means the date 28 days prior to the latest date
for submission of the Tender.
1.1.3.2 “Commencement Date” means the date notified under
1.1.3.3
1.1.3.4
1.1.3.5
1.1.3.6
1.1.3.7 Sub-Clause 8.1 [Commencement of Works], unless otherwise defined in the Contract Agreement. “Time for Completion” means the time for completing the Works or a Section (as the case may be) under Sub-Clause 8.2 [Time for Completion], as stated in the Particular Conditions (with any extension under Sub-Clause 8.4 [Execution of Time for Completion]), calculated from the Commencement Date. “Tests on Completion” means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the works or a Section (as the case may be) are taken over by the Employer. “Taking-Over Certificate” means a certificate issued under Clause 10 [Employer’s Taking Over]. “Tests after Completion” means the tests (if any) are specified in the Contract and which are carried out under Clause 12 [Tests after Completion] after the works or a Section (as the case may be) are taken over by the Employer. “Defects Notification Period” means the period for notifying
defects in the Works or a Section (as the case may be) under
Sub-Clause 11.1 [Completion of Understanding Works and
Remedying Defects], as stated in the Particular Conditions
(with any extension under Sub-Clause 11.3 [Extension of
Defects Notification Period]), calculated from the date on
which the Works or Section is competed as certified under
Sub-Clause 10.1 [Taking Over of the Works and Sections]. If
no such period is stated in the Particular Conditions, the period
shall be one year.
1.1.3.8 “Performance Certificate” means the certificate issued under
Sub-Clause 11.9 [Performance Certificate].
1.1.3.9 “day” means a calendar day and “year” means 365 days.
1.1.4 Money and Payments
1.1.4.1 “Contract Price” means the agreed amount stated in the
Contract Agreement for the design, execution and completion
of the Works and the remedying of any defects, and includes
adjustment (if any) in accordance with the contract.
1.1.4.2 “Cost” means all expenditure reasonably incurred (or to be
incurred) by the Contractor, whether on or off the Site,
including overhead and similar charges, but does not include
profit.
1.1.4.3 “Final Statement” means the statement defined in
Sub-Clause …… 此处隐藏:5396字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [实用文档]李践-有效提升销售的12大黄金法则8-大
- [实用文档]党支部换届工作方案
- [实用文档]2013年下期电子商务专业部宣传工作计划
- [实用文档]方庄一矿通风、钻探绩效工资考核管理办
- [实用文档]项目一 认识企业物流认识企业物流
- [实用文档]MBI_Display_产品蓝图规画
- [实用文档]北京市建筑业劳务作业人员普法维权培训
- [实用文档]锅炉燃烧调整与运行优化
- [实用文档]4支付结算业务的核算
- [实用文档]米什金_货币金融学_第9版各章学习指导
- [实用文档]水泥混凝土路面硬化工程施工组织设计
- [实用文档]钢筋工程安全技术交底书
- [实用文档]关于公布华中师范大学本科毕业论文
- [实用文档]太原市园林绿化施工合同范本 2
- [实用文档]周日辅导 初中英语分类复习单项选择题(
- [实用文档]第四章 文化经纪人的管理形式 第二节
- [实用文档]学宪法讲宪法竞赛题库
- [实用文档]《数值计算方法》期末考试模拟试题二
- [实用文档]爱词霸学英语:每日一句( 十月)
- [实用文档]2014年国家公务员面试:无领导小组讨论
- 新课程主要理念和教学案例分析汇编(24
- 英国人的快乐源于幸福的家庭生活
- 七年级上册第一次月考模拟数学试卷
- 真丝及仿真丝的种类有哪些?
- 【最新】华师大版八年级数学下册第十六
- 高中英语3500个必背单词
- 我可以接受失败,但我不能接受放弃!
- 最近更新沪科版八年级物理上册期末试卷
- 绿化工作先进乡镇事迹材料
- 鲁教版九年级上册思想品德教学计划
- 英语音标的分类
- 地下室底板无梁楼盖与普通梁板结构形式
- 美容师黄金销售话术
- 雅思写作满分作文备考方法
- 血清甲状腺激素测定与高频彩色多普勒超
- 1度浅析装修对室内空气品质的影响
- 2017-2022年中国汞矿行业深度分析与投
- 计算机二级VB公共基础知识
- (何勇)秸秆禁烧_重在寻找出路
- 内外墙抹灰工程分包施工合同1