信息系统项目管理师考前培训班笔记(2)
risk management:
risk management planning, risk identification, risk qualitative analysis, risk quantitative analysis, risk response planning, risk monitoring and control
procurement management:
Procurement planning, solicitation planning, source selection, solicitation, contract administration
Initiating processes, planning processes, executing processes, controlling processes, closing processes
Iterative 反复的,重复的,迭代的 Interaction 交互作用
9大管理38个过程,每个管理都有: Inputs
Tools and techniques Outputs
Team development团队建设:developing individual and group skills / competencies to enhance project performance. Competency能力
Larger project, smaller project,subproject Deliverable可交付物
Contingency 偶然,可能性,意外事故 Distinguish 区别,辨别 Workaround工作区 Life-cycle 生命周期
Occur vt.发生 Occurrence Occurrent
Approach 方法,通路 动手处理 Accomplishment n. 完成
信息系统项目管理师考前培训班笔记
Subdivision 细分,一部
Subproject, a smaller portion(一部分) of the overall(全部的,全面的) project.
Precedence (优先,居先)diagram Successor 继任,接任activity Predecessor 前辈,前任
AOA: Activity On Arrow,参见箭线图 arrow diagramming method (ADM) AON: Activity On Node,参见前导图 precedence diagramming method (PDM) EON: Event On Node, 参见PERT图
ADM:
PDM: Precedence Diagram Method.
A network diagramming technique in which activities are represented by boxes (or nodes). Activities are linked by precedence relationships to show the sequence in which the activities are to be performed.
CPM: Critical Path Method: A network analysis technique used to predict project duration by analyzing which sequence of activities (which path) has the least amount of scheduling flexibility (the least of amount of float). Early dates are calculated by means of a forward pass. Using a specified start date. Late dates are calculated by means of a backward pass, starting from a specified completion date (using the forward pass s calculated project early finish date.)
PERT: Program Evaluation and Review Technique
An event-oriented network analysis technique used to estimate program duration when there is uncertainty in the individual activity duration estimates.
PERT applies the CPM using durations that are computed by a weighted average of optimistic , pessimetic 。。。。
Logical Relationship: F-S F-F S-S S-F
Target Completion Date (TC). An imposed(强制的,规定的) date that constrains or otherwise modifies the network analysis. Narrative 叙述性的
项目章程:高层经理下达的一份文件,向项目经理提供在项目作业中应用组织性资源的权力。 范围说明:包括项目各阶段的可交付成果和项目目标到了一定程序必须采取控制的WBS。 辅助的管理计划:范围管理计划,风险管理计划,采购计划。
可交付物:
Any measurable, tangible, verifiable outcome, result, or item that must be produced to complete a project or part of a project. Often used more narrowly in reference to an external deliverable, which is a deliverable that is subject to approval by the project sponsor or customer. Tangible 切实的
活动:项目执行过程中的一个工作元素,一个活动通常有一个预期的历时、预期的成本、预期的资源需求。活动通常可以分解为任务。
任务:
A generic term for work that is not included in the work breakdown structure, but potentially could be a further decomposition of work by the individuals responsible for that work. Also, lowest level of effort (LOE) on a project.
工作包
A deliverable at the lowest level of the work breakdown structure, when that deliverable may be assigned to another project manager to plan and execute. This may be accomplished through the use of a subproject where the work package may be further decomposed into activities.
基线:
The original approved plan (for a project, a work package, or an activity), plus or minus approved scope changes. Usually used with a modifier (e.g., cost baseline, schedule baseline, performance measurement baseline).
信息系统项目管理师考前培训班笔记
里程碑:项目中的一个重大事件,通常伴随着一个主要可交付物的完成。
Milestone: A significant event in the project, usually completion of a major deliverable.
Milestone schedule. A summary-level schedule that identifies the major milestones. See also master schedule.
Network Analysis. 网络分析,识别项目活动中没完成部分的最早和最晚开始时间、完成时间 的一个过程。
The process of identifying eartly and late start and finish dates for the uncompleted portions of project activities.
Resource planning. Determining what resources(people, equipment, materials) are needed in what quantities to perform project activity.
资源计划:决定什么资源(人力,设备,原料)可以使用,而且需要的数量。
Retain 保持,保留 Mitigation 缓解,减轻
Monte Carlo Analysis蒙特卡罗分析主要用于仿真。 Parametric Estimating 参数估计 Aggregation集合
Reserve, Provision 预备,防备,储备 Reconciliation 和解,调解, Accuracy 精确性 Currency 流通,货币
Approximation 接近, 走近, [数]近似值
optimistic 乐观的, Pessimistic 悲观的, Most likely duration 最可能的历时
Bar Chart ,Gantt Chart
WP: Work Perform
EVM: Earned Value Management
RAM: Responsibility Assignment Matrix责任分配矩阵 QA: Quality Assurance QC: Quality Control
价值分析 敏感度分析
费用+费用补偿合同 固定总价合同
客户合作胜过合同谈判
项目绩效考核与绩效管理:
团队绩效与项目绩效的关系 绩效评估方法 项目绩效指标设计 绩效改进
知识产权
知识产权的客体即智力创作性成果(或称为知识产品),是一种没有形体的精神财富。 1, 无形性 2, 独占性
3, 双重性(如著作权有财产权、身份权) 4, 时间性 5, 地域性
…… 此处隐藏:2814字,全部文档内容请下载后查看。喜欢就下载吧 ……相关推荐:
- [教育文库]夜场KTV服务员的岗位职责及工作流程[1]
- [教育文库]企划、网络、市场绩效考核方案
- [教育文库]学党史、知党情、强党性--“党的基本理
- [教育文库]2016年高考物理大一轮总复习(江苏专版
- [教育文库]干部廉洁自律自查自纠的报告
- [教育文库]2010年北京大学心理学系拟录取硕士研究
- [教育文库]资金时间价值练习题及答案
- [教育文库]保护环境的心得体会
- [教育文库]英语角内容:英语趣味小知识
- [教育文库]档案收集与管理工作通知
- [教育文库]劳动规章制度范本范本
- [教育文库]高考物理一轮复习课后限时作业1运动的
- [教育文库]机械工艺夹具毕业设计195推动架设计说
- [教育文库]通用技术教学比赛说课稿2
- [教育文库]2018年四年级英语下册 Module 7 Unit 2
- [教育文库]第2章 宽带IP网络的体系结构
- [教育文库]九年级化学第五单元课题3《根据化学方
- [教育文库]小学英语六年级情态动词用法归纳
- [教育文库]甲级单位编制窑井盖项目可行性报告(立
- [教育文库]2016-2021年中国城市规划行业全景调研
- 高考英语听力十大场景词汇总结
- 全省领导班子思想政治建设座谈会会议精
- 人教版新课标高一英语提优竞赛试题 下
- 江西省2014年生物中考试题
- 长沙镇食品药品安全事故应急预案
- 《金刚石、石墨和C60》片段教学设计
- 福州教育学院(王旭东)
- 基于EDA音乐播放器的设计
- 9、古诗两首《夜书所见》《九月九日忆
- 小学语文课外阅读有效策略探讨
- 贵州文化产业发展成支柱产业的问卷调查
- 膀胱类癌的诊治体会(附3例报告)
- 发动机积碳产生的原因
- Configuring Code Composer Studio for
- 学生良好的心理素质如何培养点滴谈
- 46 电沉积法制备锂离子电池用硅-锂薄膜
- 美舍雅阁公司管理中各部门职责
- 去壳剥皮的小妙招
- 六自由度运动平台的仿真研究
- Pride and Prejudice(傲慢与偏见)