On the whole process of construction 附件:
project cost control
On the whole process of construction project cost control 【Abstract】: This article mainly introduced the engineering project cost control throughout the whole process of project implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages.
【Keywords】: Project, the construction cost, engineering, project, construction, project cost
Engineering project cost control throughout the whole process of project implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages. According to the statistics show that, in the project decision-making stage and design stage, and the influence of construction project cost is a 40% chance-75%; and in construction stage, influence the possibility of construction project cost is only 5%-25%.Obviously, control the cost of the key link is in the project implementation of decision-making and design stage before. And from a stage program speaking, construction management can play a decisive role. To control the engineering cost is in the design phase, project decision stage, stage of construction, project bidding, completed the stage of the settlement construction engineering cost incurred amount of control in the approval within the limit, and correct the deviation of at any time, ensure pision breakdown their investment goal the realization, to get the best economic benefit and social benefit.
1 whole process cost control each phase of the basic situation
The whole process of construction project cost control can be pided into the following basically five stages:
1.1 construction project cost control decision-making stage
P roject investment decision is choice and decided to invest action process, is aiming project
on the necessity and feasibility of technical and economic the authentication, correct decision-making is reasonable and the premise to control the engineering cost, including feasibility study, investment estimation, financial foundation estimates and evaluation data. Project investment decision stage cost control and management of the key is:
1) Completes the project decision-making before preparation. Comprehensive collecting have material, including equipment operation, equipment technical parameters, the construction market dynamic and other related content of the original records and information. To do the scientific research work and then find out need emphasizes to solve the problems.
2) to do a project proposal and feasibility studies reports. Must according to the market demand and development prospects, reasonably determine the scale of the project and construction standards. Two applications should be strong conviction and feasibility. In the fight for early project at the same time, should be completed as soon as possible of the feasibility study.
3) science to develop the construction projects of benefit analysis of activities of investment estimate and work. The preparation of investment estimate to have the basis, to be as careful as possible and reasonable. From reality, full consideration to during the project that may arise during the process of all kinds of accidents and unfavorable factors, as well as their cost of the project may produce negative effects, want to consider the market situation and construction of the reserve price during the floating coefficient, like this can make the investment basically accord with the actual and leave room, make the investment estimate really play the role of control the total investment in the project.
1.2 project cost control design stage
The government in accordance with the examination and approval according to regulation, design institute of professional elaborate design, the strict control of cost engineers, the engineering construction cost control design stage "trinity" optimal combination. The construction project design is by plans to reality decisive significance of the work phase,
design work is one of the important principles to ensure that the design integrity, designed for this work include the design evaluation and comparison, the design scheme optimization design budgetary estimate, the compiling and examination, the list of quantities and control the compiling and price review.
1) Reasonable function orientation and reliable design quality, meet the national standards, meet the project function requirement, this is the quality of the design of the four basic requirements. The function of the construction project positioning, first must do with national conditions, reflect the national strength. At the same time, the engineering design must meet the construction procedure in each stage of depth requirements, avoid and prevent "Sanchez" (budget exceeds the estimation, the budget exceeds the budget estimates, the settlement) takes place.
2) Optimizing design scheme, effective control of the project cost. The design phase of the project cost control and management is not a simple design institute work content, the construction unit should also actively cooperate, have prior control and active management role. The construction unit in the review of the design unit design documents, first of all the attention to the optimization of design schemes of, should be based on all kinds of index and material to the total plane design, construction space and plane design for analysis. The two analysis of the cost of the project will not only, a major impact on construction and operation and the production, management have a great impact, but also for construction and operation of the production, management …… 此处隐藏:23861字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [行业资料]创设有效语境 改善英语教学
- [行业资料]微商推广引流的44种方法
- [行业资料]医疗机构输血科血库基本标准
- [行业资料]锂离子电池项目可行性研究报告(2015年
- [行业资料]申请执行人长沙市开福区人口和计划生育
- [行业资料]倾听草木的呼吸(初中阅读)
- [行业资料]长沙新环境厂房租赁合同书
- [行业资料]2022年经济师《金融专业知识与实务(中
- [行业资料]浦东新区2009学年度第二学期期末考试七
- [行业资料]企业劳动用工协议书
- [行业资料]最新苏科版七年级数学上册第二章有理数
- [行业资料]12星座与英语词汇学习
- [行业资料]2008年高考化学科经验
- [行业资料]镇政府2015年工作总结及2016年政府工作
- [行业资料]梧州市产业园区规划及招商引资报告
- [行业资料]大体积砼承台施工作业指导书
- [行业资料]学生干部在创建和谐校园中的作1
- [行业资料]小学语文教师实习个人总结
- [行业资料]2014完美最新奖金制度
- [行业资料]2016年一建建筑实务-重要知识点地质
- 【最新】人教版小学语文三年级上册:第
- 中国中小企业年鉴(地区数据)
- 动物与人类生活的关系 ppt
- 选修3 专题3 胚胎工程知识点
- 遥感技术基础复习题
- 公司员工职业生涯规划实施方案
- 辽宁省建筑施工企业安全生产许可证管理
- 15秋福师《中外幼儿教育史》在线作业二
- 2015-2020年中国网络视频行业深度调研
- 数学八年级下华东师大版21.1算术平均数
- 苏教版一年级语文下册《小松树和大松树
- 油画论文:摄影对当下油画艺术的影响
- 西方自由主义影响下的新闻自由——从17
- 基于支持向量机的商业银行信用风险评估
- 机械设计基础复习题答案(修改)(1)
- 语文:高考作文素材:材料引用及论点论
- 月份工程进度款结算单62+56
- 2018-2023年中国互联网基金行业现状研
- 人教版 PEP 五年级下册Unit1Lesson1 th
- 2014学年第二学期四年级数学期末教学质