导读: 毕业设计外文文献翻译 院系:土木工程与建筑系 年级专业:08级工程管理 姓名:x 学号:x On the whole process of construction 附件: project cost control On the whole process of construction project cost control 【Abstract】: This article mainly

毕业设计外文文献翻译

院系:土木工程与建筑系

年级专业:08级工程管理

姓名:x

学号:x

On the whole process of construction 附件:

project cost control

On the whole process of construction project cost control 【Abstract】: This article mainly introduced the engineering project cost control throughout the whole process of project implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages.

【Keywords】: Project, the construction cost, engineering, project, construction, project cost

Engineering project cost control throughout the whole process of project implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages. According to the statistics show that, in the project decision-making stage and design stage, and the influence of construction project cost is a 40% chance-75%; and in construction stage, influence the possibility of construction project cost is only 5%-25%.Obviously, control the cost of the key link is in the project implementation of decision-making and design stage before. And from a stage program speaking, construction management can play a decisive role. To control the engineering cost is in the design phase, project decision stage, stage of construction, project bidding, completed the stage of the settlement construction engineering cost incurred amount of control in the approval within the limit, and correct the deviation of at any time, ensure pision breakdown their investment goal the realization, to get the best economic benefit and social benefit.

1 whole process cost control each phase of the basic situation

The whole process of construction project cost control can be pided into the following basically five stages:

1.1 construction project cost control decision-making stage

P roject investment decision is choice and decided to invest action process, is aiming project

on the necessity and feasibility of technical and economic the authentication, correct decision-making is reasonable and the premise to control the engineering cost, including feasibility study, investment estimation, financial foundation estimates and evaluation data. Project investment decision stage cost control and management of the key is:

1) Completes the project decision-making before preparation. Comprehensive collecting have material, including equipment operation, equipment technical parameters, the construction market dynamic and other related content of the original records and information. To do the scientific research work and then find out need emphasizes to solve the problems.

2) to do a project proposal and feasibility studies reports. Must according to the market demand and development prospects, reasonably determine the scale of the project and construction standards. Two applications should be strong conviction and feasibility. In the fight for early project at the same time, should be completed as soon as possible of the feasibility study.

3) science to develop the construction projects of benefit analysis of activities of investment estimate and work. The preparation of investment estimate to have the basis, to be as careful as possible and reasonable. From reality, full consideration to during the project that may arise during the process of all kinds of accidents and unfavorable factors, as well as their cost of the project may produce negative effects, want to consider the market situation and construction of the reserve price during the floating coefficient, like this can make the investment basically accord with the actual and leave room, make the investment estimate really play the role of control the total investment in the project.

1.2 project cost control design stage

The government in accordance with the examination and approval according to regulation, design institute of professional elaborate design, the strict control of cost engineers, the engineering construction cost control design stage "trinity" optimal combination. The construction project design is by plans to reality decisive significance of the work phase,

design work is one of the important principles to ensure that the design integrity, designed for this work include the design evaluation and comparison, the design scheme optimization design budgetary estimate, the compiling and examination, the list of quantities and control the compiling and price review.

1) Reasonable function orientation and reliable design quality, meet the national standards, meet the project function requirement, this is the quality of the design of the four basic requirements. The function of the construction project positioning, first must do with national conditions, reflect the national strength. At the same time, the engineering design must meet the construction procedure in each stage of depth requirements, avoid and prevent "Sanchez" (budget exceeds the estimation, the budget exceeds the budget estimates, the settlement) takes place.

2) Optimizing design scheme, effective control of the project cost. The design phase of the project cost control and management is not a simple design institute work content, the construction unit should also actively cooperate, have prior control and active management role. The construction unit in the review of the design unit design documents, first of all the attention to the optimization of design schemes of, should be based on all kinds of index and material to the total plane design, construction space and plane design for analysis. The two analysis of the cost of the project will not only, a major impact on construction and operation and the production, management have a great impact, but also for construction and operation of the production, management …… 此处隐藏:23861字,全部文档内容请下载后查看。喜欢就下载吧 ……

工程造价外文文献-工程造价国外参考文献.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/2272857.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)