a2o工艺污水处理厂毕业设计
目录
摘 要 .
.........................................................................................
3
Abstract ....................................................................................... 4 第一章 1.1 设计依据和任务 .................................................... 6 1.2 设计目的 ........................................................... 7
第二章 2.1 工艺流程的比较 .................................................... 8 2.2 工艺流程的选择 ................................................... 11
第三章 工艺流程设计计算....................................................... 12
3.1 设计流量的计算 ................................................... 12 3.2 设备设计计算 ..................................................... 12
3.2.1 格栅 ......................................................... 12 3.2.2 提升泵房...................................................... 13 3.2.3 沉砂池........................................................ 14 3.2.4 初沉池........................................................ 15 3.2.5 A2/O......................................................... 16 3.2.6 二沉池........................................................ 21 3.2.7 接触池和加氯间 ................................................ 24 3.2.8 污泥处理构筑物的计算 .......................................... 25
3.3 构建筑物和设备一览表 ............................................ 27
第四章 平面布置 ....................................................................... 29
4.1 污水处理厂平面布置 .............................................. 29
4.1.1平面布置原则 .................................................. 29 4.1.2具体平面布置 .................................................. 31
4.2污水处理厂高程布置 ............................................... 32
4.2.1主要任务 ...................................................... 32
4.2.2高程布置原则 .................................................. 32 4.2.3高程布置结果 .................................................. 33
第五章 供电仪表与供热系统设计 ........................................ 38
5.1变配电系统 .......................................................... 38 5.2监测仪表的设计 ...................................................... 38
第六章 劳动定员 ..................................................................... 39
6.1定员原则 ............................................................ 39 6.2污水厂人数定员 ...................................................... 39
第七章 参考文献 ....................................................................... 40 致谢 ............................................................................................. 41 英文原文与文献 .................................................. 42
摘 要
以作为某开发区污水处理厂的初步设计和施工图设计。该处理厂处理城市污水,且水质较复杂:
化学需氧量(CODcr):260mg/L; NH3-N:30mg/L; 处理后的水质要求; BOD5≤20mg/L;
SS≤20mg/L;
CODcr≤60mg/L; NH3-N≤15mg/L;
根据设计要求和求新的思想,该污水处理工程进水中氮含量均偏高,在去除BOD5和SS的同时,还需要进行脱氮处理,故采用当代水处理工艺中较流行的A2/O工艺。
A2/O工艺由于不同环境条件,不同功能的微生物群落的有机配合,加之厌氧、缺氧条件下,部分不可生物降解的有机物能被开环或断链,使得N、P、有机碳被同时去除,并提高对不可降解有机物的去除效果。它可以同时完成有机物的去除,硝化脱氮、磷的过量摄取而被去除等功能,脱氮的前提是NH3-N应完全硝化,好氧池能完成这一功能,缺氧池则完成脱氮功能。厌氧池和好氧池联合完成除磷功能。
此外该工艺还具有高效、节能的特点,且耐冲击负荷较高,出水水质好。因此,更具有广泛的适应性,完全适合本设计的实际要求。本工艺的主要构筑物包括格栅、污水泵房、平流沉砂池、好氧池、厌氧池、缺氧池、二沉池、接触消毒池、浓缩池、污泥脱水机房等。
本设计采用了A2/O为主体工艺,工艺流程相对简单,省去了污泥消化系统,节省了基建投资和运行费用,该工艺处理污水运行稳定,易于管理,出水水质达到设计要求,真正做到了污水的综合利用。
关键词:A2/O 格栅 泵房 新工艺 二沉池
Abstract
It is a preliminary design and construction drawing for the sewage treatment plant
development zone. This plant treats municipal sewage mainly. Its water quality is more complicated:
Suspended substance (SS): 200mg/L;
The chemical oxygen demand (CODcr
NH3-N: 30mg/L;
Treated water quality is required: BOD5≤20mg/L; SS≤20mg/L;
CODcr≤60 mg/L; NH3-N≤15mg/L;
According to the designing requirement and thought of looking for novelty: the content of nitrogen in the municipal sewage is on the high side in this project .so while getting rid of
BOD5 andSS, it should be treated with a proper process. We adopt and use a kind of craft, which is a comparatively popular craft at present named Anaerobic-Anoxic-Oxic.
The advantage of this comprehensive craft is extensive adaptability , totally suitable for reality originally designed purpose. Its main structures includes gate well , grid , sewage pumping house , earate and sinking sand pool , oxidizing ditch , the second sinking pool, contacting pool , concentration tank , mud to dehydrate in the computer lab etc.
Process due to different environmental conditions, different functions of microbial communities in the organic, combined with anaerobic, anoxic condition, some non-biodegradable organic matter can be open or broken chain, making N, P, organic carbon is also removed, and to enhance non-degradable organic removal. It can simultaneously remove organic matter, nitrification and denitrification, excessive intake of phosphorus was removed and other functions, provided that removal of NH3 - N should be fully nitrification, aerobic tank to complete the function, oxygen tank is complete removal function. Anaerobic tank and aerobic phosphorus removal capabilities to complete the joint poo …… 此处隐藏:11297字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [法律文档]苏教版七年级语文下册第五单元教学设计
- [法律文档]向市委巡视组进点汇报材料
- [法律文档]绵阳市2018年高三物理上学期第二次月考
- [法律文档]浅析如何解决当代中国“新三座大山”的
- [法律文档]延安北过境线大桥工程防洪评价报告 -
- [法律文档]激活生成元素让数学课堂充满生机
- [法律文档]2014年春学期九年级5月教学质量检测语
- [法律文档]放射科标准及各项计1
- [法律文档]2012年广州化学中考试题和答案(原版)
- [法律文档]地球物理勘查规范
- [法律文档]《12系列建筑标准设计图集》目录
- [法律文档]2018年宁波市专技人员继续教育公需课-
- [法律文档]工会委员会工作职责
- [法律文档]2014新版外研社九年级英语上册课文(完
- [法律文档]《阅微草堂笔记》部分篇目赏析
- [法律文档]尔雅军事理论2018课后答案(南开版)
- [法律文档]储竣-13827 黑娃山沟大开挖穿越说明书
- [法律文档]《产品设计》教学大纲及课程简介
- [法律文档]电动吊篮专项施工方案 - 图文
- [法律文档]实木地板和复合地板的比较
- 探析如何提高电力系统中PLC的可靠性
- 用Excel函数快速实现体能测试成绩统计
- 教师招聘考试重点分析:班主任工作常识
- 高三历史选修一《历史上重大改革回眸》
- 2013年中山市部分职位(工种)人力资源视
- 2015年中国水溶性蛋白市场年度调研报告
- 原地踏步走与立定教学设计
- 何家弘法律英语课件_第十二课
- 海信冰箱经销商大会——齐俊强副总经理
- 犯罪心理学讲座
- 初中英语作文病句和错句修改范例
- 虚拟化群集部署计划及操作流程
- 焊接板式塔顶冷凝器设计
- 浅析语文教学中
- 结构力学——6位移法
- 天正建筑CAD制图技巧
- 中华人民共和国财政部令第57号——注册
- 赢在企业文化展厅设计的起跑线上
- 2013版物理一轮精品复习学案:实验6
- 直隶总督署简介