导读: 连续不断的给其中一组线圈通上交流电流能产生电磁场,由于线圈的位置是相互垂直的,所以在不受力时另一组线圈是没有耦合的。 However, then the transducer is subjected to a force, as shown in the figure, the

连续不断的给其中一组线圈通上交流电流能产生电磁场,由于线圈的位置是相互垂直的,所以在不受力时另一组线圈是没有耦合的。

However, then the transducer is subjected to a force, as shown in the figure, the magnetic field pattern changes. A portion of the field couples with the second winding and induces an AC voltage that reflects the tension exerted by the web on the measurement roll. This voltage-a comparatively

4

strong transducer signal-is converted by the load cell system’s tension electronics into a system output.

当然,在压力传感器收到外力时,磁场的模式发生了变化(理解是磁路发生了变化),一部分磁场耦合到另一个线圈从而产生一个交流电压,这个交流电压就是安装在的测量棍上幅面材料的张力状态。这个电压信号-相对强的压力传感器的信号-张力测量装置转换成一个系统的输出。(如图)

Chapter 2 Installation (第2章 安装)

2.1 About this Chapter

The way you install your system has more influence on its functionality, accuracy and reliability than you might think. The more accurate the installation, the better the measurement system. By following the instructions in this chapter, you will fulfill the most important requirements for proper mechanical and electrical installation.

The equipment is a precision instrument which although intended for severe operating conditions, must be handled with care.

安装系统的方法会意想不到地影响功能、精度和可靠性。越精准的安装,系统的测量效果越好。以下章节将对机械和电器的安装提出最重要的需求。

该设备是精密仪器,必须小心处理。

2.2 Safety Instructions (安全说明)

Read and follow the safety instructions given in Chapter 1 Introduction, before starting any installation work. However, local statutory regulations, if stricter, are to take precedence.

在开始任何安装工作之前,需仔细阅读并遵守第1章的安全须知。如当地的法律法规,更严格的,要优先考虑。

2.3 Mounting the load cells (测压元件安装)

Installation requirements and mounting instructions are give in: 安装所要求的必被条件和装配说明书

· Appendix B PFCL 301E-Designing the Load Cell Installation · Appendix C PFTL 301E-Designing the Load Cell Installation · Appendix D PFRL 101-Designing the Load Cell Installation · Appendix E PFTL 101-Designing the Load Cell Installation

附录B PFCL 301E- Designing 测压元件安装 附录C PFTL 301E- Designing 测压元件安装 附录D PFRL 101- Designing 测压元件安装 附录E PFTL 101- Designing 测压元件安装

2.4 Installing the Electronic Unit (安装电子单元)

2.4.1 Selecting and Routing the Cabling (选择布线路线) 2.4.1.1 Recommended Cabling (推荐布线路线)

The cabling between the load cells and the electronic unit and electrical connections must be carefully carried out in accordance with connection diagram 3BSE028140D0065 (See the appendix for your type of load cell) or according to order-specific documentation.

压头到张力测量装置的电缆电气连接可根据3BSE028140D0065(见附录中对应压头) 或按照订单文件的规定。 PFEA111/112

Cable screens should be connected: -to an earth bar close to the IP 20-Version (unsealed)

5

…… 此处隐藏:536字,全部文档内容请下载后查看。喜欢就下载吧 ……
ABB传感器PFEA111-112中英文手册(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/519405.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)