Abstract As increasingly diverse tasks are being processed on single multi-functional machine,production scheduling has become a critical issue in the planning and management of manufacturing processes.However,the majority of produc-tion scheduling literature ignores machine availability and assumes that machine is available all the time.In reality,machines physically deteriorate with increased usage and time.Thus,there is an intense need for manufacturing industries to reduce unexpected breakdowns and remain competitive,and motivating maintenance operations should be integrated into production scheduling models.With the advancements in sensor and prognostic technologies,machine ’s condition can be monitored and assessed over time through conducting predictive maintenance.Hence,based on this scheme,this study proposes a single-machine-based scheduling model incorporating production scheduling and predictive maintenance.A machine ’s effective age and remaining maintenance life are introduced to describe machine degradation.Finally,a numerical example is given;the computational results show that this integrated schedul-ing model has better performance than those existing models,which proves its efficiency.
Keywords Production scheduling .Predictive
maintenance .Health index (HI).Effective age .Remaining maintenance life (RML).Tardiness
1Introduction
In today ’s competitive market,different kinds of single machine have been designed to be able to process various products (e.g.,intelligent machine tool)and conduct diverse tasks.Hence,how to effectively arrange the sequence of tasks for a given single machine,that is production scheduling,has become a critical issue in the planning and management of manufacturing processes.As an important component of manufacturing industry,production scheduling has been widely studied and various determin-istic optimization models have been developed to maximize some measures of customer satisfaction [1].In manufactur-ing industry,production scheduling can have a major impact on the productivity of a process,it can minimize the production time and the cost by determining what to make and when to make for a production facility [2].Overall,production scheduling aims to maximize the efficiency of a given operation and ultimately reduce costs.Since the 1950s,many production scheduling models for single-machine problem,flow and job shop problem,and capacitated lot-sizing problem have been developed [3–6].And single-machine problem has been most studied among all the scheduling problems.The best research existing for a vast set of problem specifications are the procedures for minimizing the mean flow time,the maximum tardiness,and the number of late tasks.All of these procedures seek to determine the optimal task sequence based on different objectives.Based on the single-machine prob-lem,other kinds of problems such as parallel machines problem or flow shop problems are studied (discussed in Refs.[7–9]).
Although the previous theoretical production scheduling models studied how to make a good task schedule,they usually do not take machine availability constraints into
E.Pan (*):L.Xi
Department of Industrial Engineering and Logistics Management,Shanghai Jiao Tong University,
Shanghai 200240,People ’s Republic of China e-mail:pes@cee02d639b6648d7c1c74632
W.Liao
Department of Industrial Engineering,Chongqing University,Chongqing 400030,People ’s Republic of China
Int J Adv Manuf Technol (2012)60:1049–1061DOI 10.1007/s00170-011-3652-4
account and assume machines are always available for processing the tasks during the planning time horizon,yet this assumption is inappropriate in many real-world scheduling cases[5,10].In reality,machine breakdown is common after long-time operation,hence,the machine will be unavailable while processing tasks due to its failures [11].Since machine breakdown will reduce production efficiency,maintenance as an important part in manufac-turing systems is used to keep machines in good condition to decrease failures,which makes maintenance planning become more and more important in manufacturing processes.Hence,maintenance should be considered as a part of production scheduling models so that the availability of a machine is known as opposed to assumed,resulting in more robust production schedules.Like machine break-downs,when performing maintenance operations,the tasks being processed must be stopped.The machine will be unavailable when an accidental breakdown or a mainte-nance operation occurs.Thus,a good maintenance planning should be considered to make production scheduling model more realistic.As machine breakdown is stochastic and maintenance is deterministic,maintenance planning can be treated as availability constraint in a production scheduling model.
As production scheduling models with the consideration of maintenance operations arouse great interest of research-ers,the machine availability problem for production scheduling models has been widely discussed in the past decades.However,those production scheduling models with maintenance planning usually do not consider machine degradation.Most of them just pre-design a fixed mainte-nance interval and arrange job sequences based on this maintenance interval,which cannot show maintenance operation’s real influence on production scheduling model. The related literature review is given below in Section2. Hence,in order to describe the interaction between production scheduling and maintenance planning,this study is devoted to propose an integrated scheduling model by incorporating production scheduling …… 此处隐藏:48105字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [行业资料]创设有效语境 改善英语教学
- [行业资料]微商推广引流的44种方法
- [行业资料]医疗机构输血科血库基本标准
- [行业资料]锂离子电池项目可行性研究报告(2015年
- [行业资料]申请执行人长沙市开福区人口和计划生育
- [行业资料]倾听草木的呼吸(初中阅读)
- [行业资料]长沙新环境厂房租赁合同书
- [行业资料]2022年经济师《金融专业知识与实务(中
- [行业资料]浦东新区2009学年度第二学期期末考试七
- [行业资料]企业劳动用工协议书
- [行业资料]最新苏科版七年级数学上册第二章有理数
- [行业资料]12星座与英语词汇学习
- [行业资料]2008年高考化学科经验
- [行业资料]镇政府2015年工作总结及2016年政府工作
- [行业资料]梧州市产业园区规划及招商引资报告
- [行业资料]大体积砼承台施工作业指导书
- [行业资料]学生干部在创建和谐校园中的作1
- [行业资料]小学语文教师实习个人总结
- [行业资料]2014完美最新奖金制度
- [行业资料]2016年一建建筑实务-重要知识点地质
- 【最新】人教版小学语文三年级上册:第
- 中国中小企业年鉴(地区数据)
- 动物与人类生活的关系 ppt
- 选修3 专题3 胚胎工程知识点
- 遥感技术基础复习题
- 公司员工职业生涯规划实施方案
- 辽宁省建筑施工企业安全生产许可证管理
- 15秋福师《中外幼儿教育史》在线作业二
- 2015-2020年中国网络视频行业深度调研
- 数学八年级下华东师大版21.1算术平均数
- 苏教版一年级语文下册《小松树和大松树
- 油画论文:摄影对当下油画艺术的影响
- 西方自由主义影响下的新闻自由——从17
- 基于支持向量机的商业银行信用风险评估
- 机械设计基础复习题答案(修改)(1)
- 语文:高考作文素材:材料引用及论点论
- 月份工程进度款结算单62+56
- 2018-2023年中国互联网基金行业现状研
- 人教版 PEP 五年级下册Unit1Lesson1 th
- 2014学年第二学期四年级数学期末教学质