2010.1.28 process audit detailed record
审核
LEONI DK WEIHAI A Product Development Process
Process AuditQuestionaire VDA 6 T.3
a) Product Development 1 Planning .1 Are the customers requirements available?
Points
nb
.2 Is a product development plan available and are the targets maintened?
nb
.3 Sind die Kapazitäten für die Realisierung der Produktentwicklung geplant?
nb
.4 Have the product requirements been determined and considered?
nb
.5 Has the feasibility been determined based on the available requirements?
nb
.6 Are the necessary personnel and technical conditions for the project process planned?
nb
2010.1.28 process audit question
1/ 15
审核
LEONI DK WEIHAI A Product DevelopmentProcess
Process AuditQuestionaire VDA 6 T.3
a) Product Development (Design) 2 Realizing Product Development .1 Is the design FMEA raised and are the improvement measures established?
Points
nb
.2 Is the design FMEA updated in the project process and are the esstablished measures realized?
nb
.3 Is a quality plan prepared?
nb
.4 Are the required releases records at the respective times?
nb
.5 Are the required resources available?
nb
2010.1.28 process audit question
2/ 15
审核
LEONI DK WEIHAI A Product Development Processb) Process Development 3 Process Development Planning .1 Are the product requirements available?
Process AuditQuestionaire VDA 6 T.3
Points
6
the tolerance standard 7611 mentioned on customer's drawing (VOLVO 14611477) is not avaiable. And some other special tech requirements on cusomer's drawing is ignored on DK internal production drawing. VOLVO 14611477原始图纸上提及的尺寸标准7611在威海工厂没有正式发行版本。原始图纸上提及的其他特殊要求在生产图纸上被忽略了。
.2 Is a process development plan available and are the target maintained?1. the genral project plan for J309 and VOLVO are available. However, milestone review record or updated task list are not available(there is no original project meeting hole between Weihai and Bussan) 2.the drawing and other document in hardware or software are not kept in good condition. 1.威海工厂有从韩国获得总体的J309和VOLVO项目计划,但是各项目阶段双方沟通的任务进展记录未可见。 (韩国和威海之间没有召开过系统项目会议) 2.项目文件的软/硬拷贝没有做有效的管理。
4
.3 Are the resources for the realization of Serial Production planned?the function of assembly board is not sufficient for VOLVO (without release) the PC of testing board can not be used at site(volvo 14585835) VOLVO的组立台不能满足生产需要部分测试台的电脑已经损坏(如VOLVO14585835)
6
.4 Have the process requirements been determined and considered?1. there are over three components in production BOM of volvo 14611793 different from customer's drawing. 2. Some process development can not satisfied the working requirement(eg. 1746A&1744A ) 1. VOLVO 14611793 BOM上有3处零件与图纸不符合。 2.
部分工艺设计不能满足生产的需要
4
.5 Are the necessary personnel and technical preconditions for the project process planned?there is no organized project team and approved project leader for J309 and VOLOV in China plant for tansfering from Bussan to Weihai中国工厂未见J309和VOLVO的项目团队组织图,并且未指定项目负责人。项目的移转在韩国和中国工厂间未形成有效的沟通。
4
.6 Is the process FMEA raised and are improvement measures established?1. some of process engineer make no sense of FMEA. 2. The pre-launch FMEA and control plan of J309 are not available. 1.一些工艺工程师对FMEA完全不了解。 2.J309预生产FMEA和控制计划未见
0
2010.1.28 process audit question
3/ 15
审核
LEONI DK WEIHAI A Product Development Processb) Process Development
Process AuditQuestionaire VDA 6 T.3
4 Realizing Process Development .1 Is the process FMEA updated when amendments are made during the project process and are theestablished measures implemented?the FMEA from Bussan is not translated from Korea version to Chinese and without update.从韩国过来的FMEA没有被翻译成中文版本,且未进行有效的更新。
Points
0
.2 Is a quality plan prepared?The China plant has not gotten and approved Quality Plan of J309 form Bussan,except GP12。除GP12,中国工厂未获得已经过认可的J309先期产品质量策划
6
.3 Are the required releases records available at the respective times?The existing mass production equipiment and applicator are released.However, the applicators for the new project VOLVO and J309 are not released by HQ.当前量产设备是批准的,但对于新项目的(VOLVO和J309)模具没有经总部批准(无报告)。
6
VOL
.4 Is a pre-production carried out under serial conditions for the serial release?The current mass production were released but not release report.当前的量产是批准过的,但报告未可见。
8
.5 Are the production and inspection documents available and complete?
10
.6 Are the required ressources available?
NB
2010.1.28 process audit question
4/ 15
审核
Process Audit
Questionaire VDA 6 T.3
审核
LEONI DK WEIHAI B Serial Production
Process AuditQuestionaire VDA 6 T.3
5 Suppliers/Input material .6 Are procedures agreed with the customer, regarding customer-supplied products, maintened?Bussan
Points
NB
.7 Are the stock levels of input material matched to production needs?1. On Jan. 21 2010, there are 212 kinds material in shortage to fullfil the production plan. 2. Non-conformity holding area is not available in FORS-system. 1. 2010年1月21日,有212种材料因缺少而不能满足生产计划。 2.不合格的原材料控制区域在FORS里没有体现。
4
.8 Are input materials/internal residues delivered and stored according to their purpose?1. There are 28 calbes C32HF-XXX replace C321H-XX on production, ho …… 此处隐藏:14918字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [法律文档]苏教版七年级语文下册第五单元教学设计
- [法律文档]向市委巡视组进点汇报材料
- [法律文档]绵阳市2018年高三物理上学期第二次月考
- [法律文档]浅析如何解决当代中国“新三座大山”的
- [法律文档]延安北过境线大桥工程防洪评价报告 -
- [法律文档]激活生成元素让数学课堂充满生机
- [法律文档]2014年春学期九年级5月教学质量检测语
- [法律文档]放射科标准及各项计1
- [法律文档]2012年广州化学中考试题和答案(原版)
- [法律文档]地球物理勘查规范
- [法律文档]《12系列建筑标准设计图集》目录
- [法律文档]2018年宁波市专技人员继续教育公需课-
- [法律文档]工会委员会工作职责
- [法律文档]2014新版外研社九年级英语上册课文(完
- [法律文档]《阅微草堂笔记》部分篇目赏析
- [法律文档]尔雅军事理论2018课后答案(南开版)
- [法律文档]储竣-13827 黑娃山沟大开挖穿越说明书
- [法律文档]《产品设计》教学大纲及课程简介
- [法律文档]电动吊篮专项施工方案 - 图文
- [法律文档]实木地板和复合地板的比较
- 探析如何提高电力系统中PLC的可靠性
- 用Excel函数快速实现体能测试成绩统计
- 教师招聘考试重点分析:班主任工作常识
- 高三历史选修一《历史上重大改革回眸》
- 2013年中山市部分职位(工种)人力资源视
- 2015年中国水溶性蛋白市场年度调研报告
- 原地踏步走与立定教学设计
- 何家弘法律英语课件_第十二课
- 海信冰箱经销商大会——齐俊强副总经理
- 犯罪心理学讲座
- 初中英语作文病句和错句修改范例
- 虚拟化群集部署计划及操作流程
- 焊接板式塔顶冷凝器设计
- 浅析语文教学中
- 结构力学——6位移法
- 天正建筑CAD制图技巧
- 中华人民共和国财政部令第57号——注册
- 赢在企业文化展厅设计的起跑线上
- 2013版物理一轮精品复习学案:实验6
- 直隶总督署简介