审核

LEONI DK WEIHAI A Product Development Process

Process AuditQuestionaire VDA 6 T.3

a) Product Development 1 Planning .1 Are the customers requirements available?

Points

nb

.2 Is a product development plan available and are the targets maintened?

nb

.3 Sind die Kapazitäten für die Realisierung der Produktentwicklung geplant?

nb

.4 Have the product requirements been determined and considered?

nb

.5 Has the feasibility been determined based on the available requirements?

nb

.6 Are the necessary personnel and technical conditions for the project process planned?

nb

2010.1.28 process audit question

1/ 15

审核

LEONI DK WEIHAI A Product DevelopmentProcess

Process AuditQuestionaire VDA 6 T.3

a) Product Development (Design) 2 Realizing Product Development .1 Is the design FMEA raised and are the improvement measures established?

Points

nb

.2 Is the design FMEA updated in the project process and are the esstablished measures realized?

nb

.3 Is a quality plan prepared?

nb

.4 Are the required releases records at the respective times?

nb

.5 Are the required resources available?

nb

2010.1.28 process audit question

2/ 15

审核

LEONI DK WEIHAI A Product Development Processb) Process Development 3 Process Development Planning .1 Are the product requirements available?

Process AuditQuestionaire VDA 6 T.3

Points

6

the tolerance standard 7611 mentioned on customer's drawing (VOLVO 14611477) is not avaiable. And some other special tech requirements on cusomer's drawing is ignored on DK internal production drawing. VOLVO 14611477原始图纸上提及的尺寸标准7611在威海工厂没有正式发行版本。原始图纸上提及的其他特殊要求在生产图纸上被忽略了。

.2 Is a process development plan available and are the target maintained?1. the genral project plan for J309 and VOLVO are available. However, milestone review record or updated task list are not available(there is no original project meeting hole between Weihai and Bussan) 2.the drawing and other document in hardware or software are not kept in good condition. 1.威海工厂有从韩国获得总体的J309和VOLVO项目计划,但是各项目阶段双方沟通的任务进展记录未可见。 (韩国和威海之间没有召开过系统项目会议) 2.项目文件的软/硬拷贝没有做有效的管理。

4

.3 Are the resources for the realization of Serial Production planned?the function of assembly board is not sufficient for VOLVO (without release) the PC of testing board can not be used at site(volvo 14585835) VOLVO的组立台不能满足生产需要部分测试台的电脑已经损坏(如VOLVO14585835)

6

.4 Have the process requirements been determined and considered?1. there are over three components in production BOM of volvo 14611793 different from customer's drawing. 2. Some process development can not satisfied the working requirement(eg. 1746A&1744A ) 1. VOLVO 14611793 BOM上有3处零件与图纸不符合。 2.

部分工艺设计不能满足生产的需要

4

.5 Are the necessary personnel and technical preconditions for the project process planned?there is no organized project team and approved project leader for J309 and VOLOV in China plant for tansfering from Bussan to Weihai中国工厂未见J309和VOLVO的项目团队组织图,并且未指定项目负责人。项目的移转在韩国和中国工厂间未形成有效的沟通。

4

.6 Is the process FMEA raised and are improvement measures established?1. some of process engineer make no sense of FMEA. 2. The pre-launch FMEA and control plan of J309 are not available. 1.一些工艺工程师对FMEA完全不了解。 2.J309预生产FMEA和控制计划未见

0

2010.1.28 process audit question

3/ 15

审核

LEONI DK WEIHAI A Product Development Processb) Process Development

Process AuditQuestionaire VDA 6 T.3

4 Realizing Process Development .1 Is the process FMEA updated when amendments are made during the project process and are theestablished measures implemented?the FMEA from Bussan is not translated from Korea version to Chinese and without update.从韩国过来的FMEA没有被翻译成中文版本,且未进行有效的更新。

Points

0

.2 Is a quality plan prepared?The China plant has not gotten and approved Quality Plan of J309 form Bussan,except GP12。除GP12,中国工厂未获得已经过认可的J309先期产品质量策划

6

.3 Are the required releases records available at the respective times?The existing mass production equipiment and applicator are released.However, the applicators for the new project VOLVO and J309 are not released by HQ.当前量产设备是批准的,但对于新项目的(VOLVO和J309)模具没有经总部批准(无报告)。

6

VOL

.4 Is a pre-production carried out under serial conditions for the serial release?The current mass production were released but not release report.当前的量产是批准过的,但报告未可见。

8

.5 Are the production and inspection documents available and complete?

10

.6 Are the required ressources available?

NB

2010.1.28 process audit question

4/ 15

审核

Process Audit

Questionaire VDA 6 T.3

审核

LEONI DK WEIHAI B Serial Production

Process AuditQuestionaire VDA 6 T.3

5 Suppliers/Input material .6 Are procedures agreed with the customer, regarding customer-supplied products, maintened?Bussan

Points

NB

.7 Are the stock levels of input material matched to production needs?1. On Jan. 21 2010, there are 212 kinds material in shortage to fullfil the production plan. 2. Non-conformity holding area is not available in FORS-system. 1. 2010年1月21日,有212种材料因缺少而不能满足生产计划。 2.不合格的原材料控制区域在FORS里没有体现。

4

.8 Are input materials/internal residues delivered and stored according to their purpose?1. There are 28 calbes C32HF-XXX replace C321H-XX on production, ho …… 此处隐藏:14918字,全部文档内容请下载后查看。喜欢就下载吧 ……

2010.1.28 process audit detailed record.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/1416202.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)