完整报价单模板(文字版)(2)
分批装运,转船
Shipping in batches, Partial Shipment,Transshipment
航空,航海,散货,整装柜
By air,By sea,Goods in bulk,Full Container
十、交货期条款(Delivery Time Terms)
订单被确定
Order Confirmed模具费用,准备模具
Mould’s Expenses,Prepare the Moulds
生产前确定样品,开始投产
Confirm the samples before production, Begin to Produce
预付定金,支付余款
Pay the deposit in advance,Pay the balance
交货期:在收到预付款后30天之内交货
Deliver the goods,the time of DeliveryDelivery time:30 days after receipt of deposit.
Delivery time:30 days after the confirmation of the order.
交货期:在订单确认后30天之内交货
Delivery time:30 days after the confirmation of pre-production samples.
交货期:在生产前样品确定后30天之内交货
十一、品牌条款(Brand’s Terms)
贴牌加工
使用客户自己的品牌或由其指定的其他品牌
OEM ,Use the brand appointed by the customer
使用工厂自己的品牌
Use the factory’s own brand
十二、原产地条款(Origin Terms)
普通原产地证,普惠制原产地证
C/O(Certificate of origin),FORM A
原产地,中国制造
Made in China,Origin Place
十三、报价单附注的其他资料(Others)
01,工商营业执照、被批准开业证件副本;
02,国税局税务登记证;
03,企业法人代码证书;
04,质量检验报告、质量鉴定报告;
05,产品质量认证、质量管理体系认证;
06,荣誉证书、奖励证书;
07,出口许可证;
08,工厂规模:员工人数,工程技术人员人数,工厂面积;
09,主营产品及月加工能力,新品推介,生产设备实力,品牌知名度.
相关推荐:
- [资格考试]石油钻采专业设备项目可行性研究报告编
- [资格考试]2012-2013学年度第二学期麻风病防治知
- [资格考试]道路勘测设计 绪论
- [资格考试]控烟戒烟知识培训资料
- [资格考试]建设工程安全生产管理(三类人员安全员
- [资格考试]photoshop制作茶叶包装盒步骤平面效果
- [资格考试]授课进度计划表封面(09-10下施工)
- [资格考试]麦肯锡卓越工作方法读后感
- [资格考试]2007年广西区农村信用社招聘考试试题
- [资格考试]软件实施工程师笔试题
- [资格考试]2014年初三数学复习专练第一章 数与式(
- [资格考试]中国糯玉米汁饮料市场发展概况及投资战
- [资格考试]塑钢门窗安装((专项方案)15)
- [资格考试]初中数学答题卡模板2
- [资格考试]2015-2020年中国效率手册行业市场调查
- [资格考试]华北电力大学学习实践活动领导小组办公
- [资格考试]溃疡性结肠炎研究的新进展
- [资格考试]人教版高中语文1—5册(必修)背诵篇目名
- [资格考试]ISO9001-2018质量管理体系最新版标准
- [资格考试]论文之希尔顿酒店集团进入中国的战略研
- 全国中小学生转学申请表
- 《奇迹暖暖》17-支2文学少女小满(9)公
- 2019-2020学年八年级地理下册 第六章
- 2005年高考试题——英语(天津卷)
- 无纺布耐磨测试方法及标准
- 建筑工程施工劳动力安排计划
- (目录)中国中央空调行业市场深度调研分
- 中国期货价格期限结构模型实证分析
- AutoCAD 2016基础教程第2章 AutoCAD基
- 2014-2015学年西城初三期末数学试题及
- 机械加工工艺基础(完整版)
- 归因理论在管理中的应用[1]0
- 突破瓶颈 实现医院可持续发展
- 2014年南京师范大学商学院决策学招生目
- 现浇箱梁支架预压报告
- Excel_2010函数图表入门与实战
- 人教版新课标初中数学 13.1 轴对称 (
- Visual Basic 6.0程序设计教程电子教案
- 2010北京助理工程师考试复习《建筑施工
- 国外5大医疗互联网模式分析




