质量管理文件-出货检验控制程序 英文
Dept. QC Reference
No. QPM-QA004
Date 2011/08/01 Rev. Date
B Page 1/4
Final Outgoing Control
Procedure
Dept. QC Reference
No. QPM-QA004
Date 2011/08/01 Rev. Date
B Page 2/4
Final Outgoing Control
Procedure
5.2. IPQC inspection:
5.2.1.Field IPQC first inspect quality and EHS of finished products, then pack qualified products into
carton, and stick product label and green label to the carton. Production team leader should transport the cartons to quarantine area, and fill in Test and Inspection Request to FQC from QC Div.
5.2.2.FQC staff conduct initial inspection on products according to Finished Products Inspection
Standards and customers’requirements, and fill in Inspection Record for the review of QC supervisor. Reinspection by QC supervisor or project supervisor is applicable when necessary.
5.2.3.Pass:
5.2.3.1.IPQC should sign on Test and Inspection Request after the finished products pass
inspection, mark “OK” on the conclusion column, stamp “ACC”chop on the upper left corner of the carton or stick blue “QC OK” label marked with pass lots and FQC staff’s signature on the upper right corner. Manfacturing Div. place pass products into storage based on Warehouse Control Procedure.
5.2.3.2.Warehouse should not take in finished products without FQC’s inspection and signature. 5.2.4.Reject:
5.2.4.1.When FQC find finished products disqualified after initial inspection, they should submit
100% Inspection Request to QC supervisor for review. Besides relevant data such as
disqualified items, cause, solution and cost, Process Inspection Record, Process Capability Analysis and other former inspection data should also be referred to, so as for field investigation and corrective actions.
5.2.4.2.After QC supervisor confirms the necessity of rework and 100% inspection of disqualified products, 100% Inspection Request should be submitted to supervisor of Manufacturing Dept. for operation, and “NG”label should be stuck on the outer carton. Manufacturing Dept. should send all fail products to Fail Area for further operation.
5.2.4.3.When rejection occurs twice for the same problem during inspection, FQC should issue Quality Defect Solution on the basis of Control Process of Corrective Action and Prevention to supervisor of Manufacturing Div. for operation.
5.2.4.4. In case of urgent order after finished products are disqualified but without major flaws in
function, dimension and appearance, Sales Div.should contact customers for delivery approval, and submit AOD (Accept on Diviation) Request based on AOD Operation Standard. Delivery is available upon approval.
5.2.4.5.When excessive hazard substances are found in finished products, Manufacturing Div.
should immediately move the products to Excessive Hazard Substances Area, and report to QC supervisor. QC supervisor should notify Sales Div., Material Div. and General Manager for review and solution.
5.3.Stock Inspection:
5.3.1.Warehouse Div. should conduct routine (quarterly) or random stock inspection based on
Warehouse Control Procedure, and submit to FQC reinspection request for hazard substances in out-of-date products or those products with damp, moldy or damaged outer package during transit or storage.
5.3.2.FQC should stick NG label on the carton of disqualified stock products, and submit 100%
Inspection Request to Manufacturing Plan Subdiv. for operation according to Control Procedure of Disqualified Products. NG cause should be analyzed based on IPQC inspection data, and proper measures should be taken to avoid the same problem. 5.4.Final Outgoing Inspection:
5.4.1.Warehouse should check model No., specifications and quantity, according to Shipping
Notice of Sales Div. or Manufacturing Div. esp. the actual quantity in the odd carton and marked quantity on the label, as well as green labels on the outer carton.Products should be placed in Delivery Area, and OQC staff should be notified after pre-delivery preparation. 5.4.2.OQC operator should inspect products according to Shipping Notice,Inspection
Standard,product drawing or customers’confirmation, and MIL-STD-105E Sampling Plan. Shipment is ready after Inspection Record filled by operator and approved by QC supervisor.
Dept. QC Reference
No. QPM-QA004
Date 2011/08/01 Rev. Date
B Page 3/4
Final Outgoing Control
Procedure
5.4.3.When defects are found during inspection, OQC operator should submit 100% Inspection Request
and Inspection Record to QC team leader and Quality Assurance Supervisor, then notify pre-delivery operator of the warehouse to replace products with different date codes or rework by
Manufacturing Dept. upon arrangement of Manufacturing Control Dept. OQC should conduct sampling inspection on replaced products or reworked products until the final products pass the test.
5.4.4. OQC should stick ACC label or stamp ACC chop on the outer carton of qualified products, upon which warehouse can arrange delivery.
5.5. OQC produce Daily Report of Finished Products Inspection according to Inspection Record of the
same day, and submit Monthly Report of Finished Products Inspection to QC team leader and Quality Assurance Supervisor before the third day of the next month. A copy of the monthly report should be submitted to Manufacturing Div. by QC Div., for the knowledge of process quality and reference of future improvement.
6.Documents
6.1.Control Procedure of Disqualified Products (QPM-QA005)
6.2. Control Procedure of Product Identification and Tracking (QPM-WA001) 6.3. Control Procedure of Corrective Action and Prevention (QPM-QA008) …… 此处隐藏:3985字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [专业资料]《蜜蜂之家》教学反思
- [专业资料]过去分词作定语和表语1
- [专业资料]苏州工业园区住房公积金贷款申请表
- [专业资料]保安管理制度及处罚条例细则
- [专业资料]2018年中国工程咨询市场发展现状调研及
- [专业资料]2015年电大本科《学前教育科研方法》期
- [专业资料]数字信号处理实验 matlab版 离散傅里叶
- [专业资料]“十三五”重点项目-虎杖白藜芦醇及功
- [专业资料]2015-2020年中国竹木工艺市场需求及投
- [专业资料]国际贸易理论与实务作业五:理论案例分
- [专业资料]财政部修订发布事业单位会计制度
- [专业资料]BCA蛋白浓度测定试剂盒(增强型)
- [专业资料]工程进度总计划横道图模板(通用版)
- [专业资料]七年级地理同步练习(天气与气候)
- [专业资料]X光安检机介绍火灾自动报警系统的组成
- [专业资料]衢州市人民政府办公室关于印发衢州市区
- [专业资料]经济全球化及其影响[1]
- [专业资料]质粒DNA限制性酶切图谱分析
- [专业资料]国家安全人民防线工作“六项”制度
- [专业资料]劳动力投入计划及保证措施
- 电子账册联网监管培训手册
- 人教版语文七年级上第1课《在山的那边
- 对我区担保行业发展现状的思考与建议
- 平面四边形网格自动生成方法研究
- 2016年党课学习心得体会范文
- 如何设置电脑定时关机
- 全球最美人妖排行榜新鲜出炉
- 社会实践调查报告及问卷
- Visual Basic习题集
- 《鱼我所欲也》课件2
- 浙江省会计从业资格考试试卷
- 全遥控数字音量控制的D 类功率放大器资
- 鞍钢宪法与后福特主义
- 电表的改装与校准实验报告(1)
- 2014年高考理科数学真题解析分类汇编:
- Windows 7 AIK 的使用
- 风电场全场停电事故应急处置方案
- 化工原理选填题题库(下)
- 关于产学研合作教育模式的学习与思考
- 西安先锋公馆项目前期定位报告