SBB365卷筒制动器-E
SBB365 Safety Disc Brake
Operator’s Manual
ZPMC FENGCHENG BRAKE Co., LTD. JIANXI HUAWU CRANE-ELECTRIC CO., LTD. Version No:1.0 Copyright reserved Date:2001/7/1
Contents
1.General …………………………………………………………………… (3)
2.Installation and Adjustment ……………………………………………… (4)
2.1 Lifting and transportation …………………………………………… (4)
2.2 Preparation before installation ……………………………………… (4)
2.3 Installation …………………………………………………………… (5)
2.4 Adjustment …………………………………………………………… (6)
3.Operation and Maintenance ……………………………………………… (7)
3.1 Operation ………………………………………………………………… (7)
3.2 Maintenance …………………………………………………………… (7)
1. General
SBB365 safety disc brake (hereinafter briefly called brake) is mainly used as emergency brake at low speed shaft (driving output shaft) for various large and middle crane at main hoist and boom hoist mechanism and cable crane at driving mechanism, or service and emergency brake for mine winder lifter, obliquitous belt conveyor at driving mechanism.
The brake is applied by disc spring and released by hydraulic pressure oil,which structure is shown as Fig.1, and the principle of operation is following: When the hydraulic fluid flows into cylinder under solenoid valve controlling, the hydraulic fluid farther press the disc spring and push the piston rod to open the arms, then braking torque is eliminated; when the solenoid valve is powered off, the pressure oil will return to oil tank by the spring force acting, simultaneously the spring force through the piston rod and the arms acts on the disc, and then the rated torque is established.
Fig.1
1. Lock nut 2. Adjusting bolt of clearance balancing 3. Braking arm A 4. Release indicating switch 5. Adjustment nut 6. Lining wear limit switch 7.Braking arm B
8. Lifting bolt 9. Exhaust and pressure gauge connector 10. Hydraulic cylinder 11. Piston 12. Disc spring group13. Monitoring window 14. Installing center adjustment nut 15. Shoes aligning device
16. Frame 17. Shoes 18. Disc
SBB365 technical data is following:
Type Released pressure
(rated/Max) Release oil volume
Clamping forceEach side released clearance 2mm 2. Installation and adjustment
2.1 Lifting and transportation
The brake must be lifted carefully in order to avoid damage, and must be lifted by using crane and lifting rope for its 686g weight. The lifting position show as fig-2. Prohibit from using other parts except lifting bolt to lift!
Fig.2
2.2 Preparation before installation
The brake must be installed correctly; otherwise, it will affect the design performance. So the users must comply with the manual strictly during installing. If need helps, please contact with our sales department.
2.2.1 check disc and brake:
a. Check if the nameplate parameters comply with requirement;
b. Check if have all parts;
c. If there is any corrosion and jamming at every pivot point;
d. Check if the lining surface have oil (grease) and other impurity which effect the performance; e. Check if the disc surface has rust, oil (grease) and damage due to welding, unevenness and other defects. Prohibit from using disc with crack or other serious defects.
If found abnormal situation, please install after dealing with it.
2.2.2 Check foundation and brake:
a. The foundation must be fixed and evenness;
b. The tolerance and surface roughness of the bracket refer to Fig.3.
2.3 Installation
2.3.1 Installing the bracket onto foundation
a. Clear the oil and dirt on the surface of foundation, and then lift the brake onto the foundation by crane.
b.Release adjustment nut (part 5, Fig.1), rotate clockwise the lock nut (part 1, Fig.1. see from the switch side) to open the arms, and ensure the distance between two linings is over 3mm than the thickness of disc.
c. Remove the opened brake to installing position, put on the foundation bolts, adjust the brake and make the edge of the lining retract about 3~5mm than outside diameter of the disc (refer to Fig.1).
d.Connect the limit switch cable (signal indication). The connection must be firmed in order to avoid accident due to the released cable. The switch cable entry stuffing is Pg13.5(3×1.5)。
Fig.3
2.3.2 Hydraulic pipeline connection and exhausting
a. Installing and adjusting hydraulic power unit well before installing the brake (please refer to the operator’s manual of hydraulic power unit), arrange the hydraulic pipeline. The oil entry thread of the brake cylinder is M18X1.5 (refer to Fig.1), the inside diameter of the pipeline must be over 10mm, and the entered oil volume is 270mL when the each side clearance of the brake is 2mm.
b. Exhaust air in the cylinder before operating and adjusting the brake, the method is: on the top of the cylinder there is exhaust and pressure gauge connector (part 9 in Fig.1). The thread of the connector is M16. When testing pressure, remove the cover and connect the pressure gauge accessory; when exhausting, remove the cover ring for anti-falling, screw the cover tightly (refer to Fig.4). After exhausting, replace the connector as delivery state.
图4
Fig.4
2.4 Adjustment
2.4.1 All adjustment must be operated before first installing and after changing new lining. At first installing, please according to following steps:
a. The adjustment of clamping force: release the brake by electric control or manual-operated pump (refer to operator’s manual of hydraulic power unit), release the lock nut (part 1, Fig.1), and rotate the adju …… 此处隐藏:8935字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [专业资料]《蜜蜂之家》教学反思
- [专业资料]过去分词作定语和表语1
- [专业资料]苏州工业园区住房公积金贷款申请表
- [专业资料]保安管理制度及处罚条例细则
- [专业资料]2018年中国工程咨询市场发展现状调研及
- [专业资料]2015年电大本科《学前教育科研方法》期
- [专业资料]数字信号处理实验 matlab版 离散傅里叶
- [专业资料]“十三五”重点项目-虎杖白藜芦醇及功
- [专业资料]2015-2020年中国竹木工艺市场需求及投
- [专业资料]国际贸易理论与实务作业五:理论案例分
- [专业资料]财政部修订发布事业单位会计制度
- [专业资料]BCA蛋白浓度测定试剂盒(增强型)
- [专业资料]工程进度总计划横道图模板(通用版)
- [专业资料]七年级地理同步练习(天气与气候)
- [专业资料]X光安检机介绍火灾自动报警系统的组成
- [专业资料]衢州市人民政府办公室关于印发衢州市区
- [专业资料]经济全球化及其影响[1]
- [专业资料]质粒DNA限制性酶切图谱分析
- [专业资料]国家安全人民防线工作“六项”制度
- [专业资料]劳动力投入计划及保证措施
- 电子账册联网监管培训手册
- 人教版语文七年级上第1课《在山的那边
- 对我区担保行业发展现状的思考与建议
- 平面四边形网格自动生成方法研究
- 2016年党课学习心得体会范文
- 如何设置电脑定时关机
- 全球最美人妖排行榜新鲜出炉
- 社会实践调查报告及问卷
- Visual Basic习题集
- 《鱼我所欲也》课件2
- 浙江省会计从业资格考试试卷
- 全遥控数字音量控制的D 类功率放大器资
- 鞍钢宪法与后福特主义
- 电表的改装与校准实验报告(1)
- 2014年高考理科数学真题解析分类汇编:
- Windows 7 AIK 的使用
- 风电场全场停电事故应急处置方案
- 化工原理选填题题库(下)
- 关于产学研合作教育模式的学习与思考
- 西安先锋公馆项目前期定位报告




