Solar controller manual 2015-5
DH Intelligent Wireless Dimming LED Solar Charge Controller
Specification
Main Features:
1. New design of wireless remote-control can modify the controller parameter and read the system
message according to the handheld device.
2. Digital high precision constant-current control, the maximum efficiency can reach 96%. 3. The working current can be adjusted from 0.15A to 3.3A, the regulating precision is 30mA.
4. High dynamic performances of load insure current output stability even though the battery voltage
and load sudden change.
5. 3 section time frame dimming function design, work time can be set range from 0h to 15 hours,
power can be set range from 0% to 100%.
6. Intelligent power mode, the load power can be adjust automatically according to the battery power,
can extend the maximum working time of the battery.
7. Record the system status, can record at a max 7days and monitor the whole system.
8. The true constant current but not limited the current, insure the current output stability thus decrease
LED light failure, increase the LED service life.
9. Metal case, IP68 waterproof degree, can suitable use in all kinds of bad conditions.
10. With modified calculation of charging, the charging efficiency is improved, which lengthen the
using time of solar energy.
11. Overheat preventing function, above a certain temperature will decrease the load or close the load. 12. Varies system protection function. Including the battery reverse connection, LED short circuit, open
circuit protection and so on. Installation and Wiring: 1. Mode identification:
Max load power
Product mode
New boosting remote control all-in-one controller
DH 100/50/20
Test Mode
Normally the controller is under the light + time control mode, Can use the remote control open the load and the load power will be changed according to the remote control setting during installation or need testing. The test mode will last 1min, after 1min the system will automatically recover to the normal working mode.
Load Working Mode:
Load connect to the DH controller have four working timeframe, each working time and working power can be adjusted arbitrary. Different combination can realize different control mode.
A. Normal Working Mode.
B. Delay Light Time Mode:For example, setting the first time working 4hours,the first power is 0%,system will lighting 4hours later.
C. Double Time Frame Mode:For example, setting the third time working 4 hours, the third power is 0%, system will be off 4hours after work through the first and second time and then enter the fourth time continue lighting until sunrise.(Remark: this mode do not have the correct function for the night length, different season will show various lighting time in the morning. Adjust item Parameter Default value The first working time The first working power The second working time The second working power The third working time The third working power The fourth working time The fourth working power LED Intelligent Power Control
0hour ~ 15hours 0% ~ 100% 0hour ~ 15hours 0% ~ 100% 0hour ~ 15hours 0% ~ 100% 0hour ~ 15hours 0% ~ 100%
4 100% 0 70% 4 50% 0 30%
2. Appearance picture is as below:
Charge indicator Battery indicator Load indicator Receive port Send port
Temperature sensor Connection leads
3. Wiring diagram is as below:
Connection sequence: Please connect the storage battery first, then connect the load, last is the solar panel. Pay attention to the “+” and “–” in case of reverse connection. LED Connection:
1. The DH Controller is internally installed with constant current source. The max output voltage is 60V. The max amount of LED lights can be connected is 18pcs in series.
2. The DH controller can automatically identify of 12V and 24V system voltage. While connect to LED load, please ensure the number of LED lights in series is appropriate.
While customer open the “Intelligent power” mode, currently the controller will enter to the intelligent
power control mode, The LED load power will adjust automatically according to the battery power. The working time and load power preset before is still valid; system will compare with the automatically power and the preset power, and then choose the small one as the load output power.
For example: when the battery power is 50%,intelligent power mode calculate the load power is 60%,if now customer preset the load power is 100%,the system will choose 60% as load power. If now customer preset the load power is 20%, the system will choose 20% as load power.
Intelligent power typical diagram is as below:
3. Before open the load, Please connect LED light first.
Warning: if the number of LED in series is not appropriate, the controller or the LED load will be damaged.
Read and Modify The Parameter:
DH solar charge controller can setting including the load working time、load working power、light control delay、charging voltage and so on. After setting finish on remote control, aim at the controller and press the ”Send” key will set up successfully .Also can read the currently setting parameter of the controller, then check the parameter setting correct or no. System Status Record:
DH solar charge controller can record the whole system running status, including the running day、over discharge times、full charged time. Also can record the battery’s voltage changing conditions in one
week which convenient for customer analysis and understanding about the system. Customer can read the running status by remote control, after read successfully; the parameter will be record in the remote control.
Charge-Discharge Control Case: The parameter of the c …… 此处隐藏:4875字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [高等教育]一年级家长课程教案
- [高等教育]封丘县人民医院深入推进纠正医药购销领
- [高等教育]2017年6月大学英语四级真题试卷及答案(
- [高等教育]2017年北京第二外国语学院文学院824中
- [高等教育]7 高中历史第7单元1861年俄国农奴制改
- [高等教育]【K12学习】4、实际测量-苏教版六年级
- [高等教育]药具培训试卷题库及部分参考答案
- [高等教育]本土电子元器件目录分销商如何赢得生意
- [高等教育]七年级岭南版美术教案
- [高等教育]书作文之书法活动通讯稿
- [高等教育]Endnote X 软件使用入门和用法总结(LS)
- [高等教育]嵌入式系统的现状及发展状况
- [高等教育]2012抗菌药物专项整治活动方案解读
- [高等教育]人教版新课本一年级数学下册期末试卷
- [高等教育]爱课程民法学观后感
- [高等教育]930机组使用说明书1
- [高等教育]煤气设备设施点检标准
- [高等教育]常见室内观叶植物图解
- [高等教育]312党员群众路线心得体会
- [高等教育]小学信息(苗版)第一册全册教案
- 在市---局2010党建大会上的讲话
- 《科哲》提纲及补充阅读材料(2010.7)
- 苏州高博软件技术职业学院论文开题报告
- 兼职导游管理的困境及对策探讨
- 基于通用设计理念的现代厨房产品语义研
- 康乐一中2010年至2011年度鼓号队、花束
- 第10章_数据收集整理与描述_期末复习课
- 2008年黑龙江林甸商贸购物中心营销策划
- 水硬度的测定实验报告
- 五分钟教你拍摄夜景光绘照
- 2014年临床妇产科三基三严试题及答案
- 0第二课 纾解压力第一站了解压力
- 解析建筑工程电气设备安装施工技术要点
- 地方性应用型本科高校“双师型”师资队
- 高考语文专题复习课件:小说阅读指导
- 装饰工程投标书2
- 大学生就业难问题探讨及对策
- English and Its History
- 青岛市城市房屋修缮工程质量监督管理办
- 初中英语形容词和副词的用法和练习题