安全文明施工费(Safe and civilized construction cost)

来源:网络收集 时间:2026-09-13
导读: 安全文明施工费(Safe and civilized construction cost)Forwarding the notice of the Ministry of construction on the construction safety protection, civilized construction measures, expenses and the use and management regulations Wuhu City [

安全文明施工费(Safe and civilized construction cost)Forwarding the notice of the Ministry of construction on the construction safety protection, civilized construction measures, expenses and the use and management regulations

Wuhu City [2006] 208

All concerned units:

In order to strengthen the safety and civilized construction management, guarantee the construction personnel working conditions and living environment, ensure safe production and civilized construction funds in place, to prevent the occurrence of accidents in the construction, the Ministry of construction "construction safety protection, civilized construction measures and the use of cost management regulations" (build do 2005 89 No.) forwarded to you, and combined with the actual situation of our city, put forward the following opinions, please follow.

A, construction safety protection, civilized construction measures fee is in accordance with the current national construction safety, construction site environmental and health standards and the relevant provisions of the cost of the purchase and replacement of construction safety equipment and facilities, improve the conditions for safe production and operation environment needed. Please see the attached list of safety protection and civilized construction measures.

Two, according to the "Anhui province construction installation engineering cost quota" (2000), "Anhui province

construction cost valuation quota" and other regulations, Anhui province construction safety protection and civilized construction rate in Annex 2.

Three, according to Annex 2 Calculation of safety protection, civilized construction measures fee, not including the safety protection and civilized construction have special requirements and high risk project to increase the safe and civilized construction measures and scheme demonstration, review and other expenses, as well as the construction units have the other requirements of the cost of the construction of security and civilization construction measures.

In case of such expenses, it shall be calculated separately, and shall be included in the measures for safety protection and civilized construction.

Four, construction safety protection, civilized construction measures for non competitive fees, not as a factor to participate in bidding. The construction units, design units in the preparation of engineering budget (pre) is; the tender or qualified intermediary agency and the preparation of the bidding documents, the bidder in the tender documents, should be in accordance with the provisions of this notice are listed separately, separate quotation, full calculation of safety protection, civilized construction measures fee. Safety protection and civilized construction project list is not listed separately in the bidding documents, bidding supervision and management institutions are not for the record in the bidding documents for the record; in the bidding documents according to the provisions of this notice for

individual safety protection, civilized construction measures fee or take into account is insufficient, can be regarded as unreasonable price shall be nullified.

The direct contracting project shall, in accordance with the provisions of this notice and the rate standard, separately charge the building safety protection and civilized construction measures in the quotation or contract.

The cost of the project and the consulting unit shall calculate the cost of safety protection and civilized construction measures in accordance with this notice and the relevant provisions when examining the completion of the project.

Five, the construction unit shall in accordance with this notice and contract, promptly to the construction units to pay security, civilized construction measures fees. The construction units in the project a month after signing the contract within the agreed or not later than seven days before the commencement date, payment security protection, civilized construction measures fee of not less than 50% of the total cost, the remaining costs shall be paid in accordance with the construction schedule, and be clear in the contract.

Six, construction units should set up special and supervision units double control of safety protection, civilized construction measures, expenses, special funds account. The construction unit should establish a cost of safety protection, civilized construction measures of the unit measures for the use and management of special safety protection, civilized construction measures fee funds, and are listed separately in

the financial management of the safety protection, civilized construction measures fee list for reference.

Seven, safety protection, civilized construction measures, costs paid to implement the first implementation of security protection, civilized construction measures after the payment of fees. Construction units in the basic test trough, the main structure of the construction to half and after the completion of the project, three times to apply for payment of security protection and civilized construction measures. The construction units pay for safety protection, civilized construction measures in the application time, must be in accordance with the mandatory standards for construction projects and the "construction safety inspection standards" (JGJ59-99) and other provisions of the construction site safety and civilized construction acceptance, reached the standards by supervision units to examine and verify the signature confirmation, reported to the municipal construction administrative department for the record after the payment.

Eight, the construction units apply for construction permits, construction contract costs should be safety protection, civilized construction measures of the agreed payment plan and set up the construction unit of the special funds account, the …… 此处隐藏:24755字,全部文档内容请下载后查看。喜欢就下载吧 ……

安全文明施工费(Safe and civilized construction cost).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/339230.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)