Hydraulic disorders and balanced discussion on
hydraulic
[Abstract] HVAC works in the building, the regulation of water balance is an important issue. In this paper, static and dynamic balance hydraulic hydraulic balance the concept of combining two kinds of hydraulic and the characteristics of balance, Analysis of the traffic flow system and the system changed several typical way of hydraulic equipment balance the choice and implementation of water balanced manner.
[key words] Hydraulic disorders; Steady ; Operation Condition ; The number of resistance 1 Hydraulic disorders and the concept of water
balance
In hot water heating system and chilled water air-conditioning system in the thermal (cold) the user's actual traffic flow and design requirements as the inconsistency between the users of water imbalance.
Hydraulic disorders can be the extent of the actual traffic flow and design requirements to measure the ratio of X, X said an imbalance of water.
X = QS/QJ(QS:The actual user traffic,QJ:The design requirements of the user traffic)
Hydraulic balance refers to the network of users in all other users of changes in traffic flow to maintain unchanged the ability of their own, usually with hydraulic stability of the user's coefficient r to that.
r=1/ XMAX = QJ/ QMAX (QJ:The design requirements of the user traffic ,QMAX:The largest user traffic )
2 Hydraulic hydraulic balance disorders and the classification
2.1 Static and passive hydraulic hydraulic balance disorders As the design, construction, equipment and other material reasons for the resistance of the pipeline system and design requirements than the number of channels of resistance ratio of inconsistency, So that the actual system user traffic flow inconsistent with the design requirements, arising from the hydraulic system disorders, called the static water imbalance.
关于水利失衡的研究(英文)
Static hydraulic imbalance is the steady, fundamental, is inherent in the system itself, is China's HVAC water in the hydraulic system disorders an important factor.
Through the pipeline system in additional static balance hydraulic equipment (hy -draulic balance valve) of the pipeline system to regulate the ratio of resistance to the pipeline design requirements of the same ratio of resistance , At this time when the system throughput to meet the design flow, the flow of terminal equipment are also to meet the design flow, static hydraulic system to achieve balance.
2.2 Dynamic imbalance of hydraulic and dynamic water balance
When a user opened the valve of changes in water flow changes, other users of the flow also will be changed, from design flow, resulting in an imbalance of water, called hydraulic dynamic imbalance.
Hydraulic dynamic imbalance is dynamic and changing , it is not inherent in the system itself, the system is in the process of the operation.
Through the new pipeline system in the dynamic balance of hydraulic equipment (flow regulator or pressure regulator) , when other users valve opening event of a cha -nge, Dynamic hydraulic equipment through the balance of shielding, so that the flow is not followed its own changes, terminal equipment does not interfere with each other traffic, when the hydraulic system to achieve dynamic balance.
3 The flow of the hydraulic system of balance
The flow of hydraulic balance HVAC system design is common in the hydraulic system, in the process of running the entire traffic system remained unchanged. Com -monly used in the following two forms:
3.1 Complete system for traffic
Complete set flow system is in the system without any dynamic valve, the system after the completion of commissioning in the early opening of the valve not to make any changes, The entire system to always maintain a constant flow. Full flow system will apply mainly to terminal equipment do not have to adjust to flow through the system, If the end of a three-speed fan coil switch regulating wind speed and the use of variable air volume air handling units of air-conditioning systems and lower system requirements, Just climate heating water temperature compensation for adjustment to meet the basic needs of the heating system.
关于水利失衡的研究(英文)
Complete set flow hydraulic system exists only static imbalance , and there is no hydraulic dynamic imbalance , the only static in the relevant parts installed hydraulic equipment can be balanced.
Usually in the engine room catchment system installed on the hydraulic balance valve; water for air-conditioning system that can return to the building each floor level of water pipes installed on the hydraulic balance valve. Figure (1-5).
For some systems, although not contain any dynamic valve, but not through other means to regulate non-flow, Therefore, in actual operation of users because of a cold or overheated rooms and change the valve opening to change the flow, so that this system can be set between traffic and variable flow between
3.2 Single-tube series (with the bypass) heating system
One-pipe heating system including the series of vertical double-standard onepipe system and vertical series single-tube systems . This system will remain basi- ically unchanged in charge of traffic, is scheduled traffic system. The former as an example to illustrate the hydraulic system to achieve a balanced manner.
Such a system exists mainly static hydraulic imbalance in the level of branches on the two-or three because of the regulatory role of Wen Kongfa . There is a certain dynamic hydraulic imbalance . So just in the relevant parts of the hydraulic balance additional related equipment to enable the system to maintain water balance . Asfoll- ows:
(1) in the engine room catchment system installed on the hydraulic balance valv …… 此处隐藏:6311字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [高等教育]一年级家长课程教案
- [高等教育]封丘县人民医院深入推进纠正医药购销领
- [高等教育]2017年6月大学英语四级真题试卷及答案(
- [高等教育]2017年北京第二外国语学院文学院824中
- [高等教育]7 高中历史第7单元1861年俄国农奴制改
- [高等教育]【K12学习】4、实际测量-苏教版六年级
- [高等教育]药具培训试卷题库及部分参考答案
- [高等教育]本土电子元器件目录分销商如何赢得生意
- [高等教育]七年级岭南版美术教案
- [高等教育]书作文之书法活动通讯稿
- [高等教育]Endnote X 软件使用入门和用法总结(LS)
- [高等教育]嵌入式系统的现状及发展状况
- [高等教育]2012抗菌药物专项整治活动方案解读
- [高等教育]人教版新课本一年级数学下册期末试卷
- [高等教育]爱课程民法学观后感
- [高等教育]930机组使用说明书1
- [高等教育]煤气设备设施点检标准
- [高等教育]常见室内观叶植物图解
- [高等教育]312党员群众路线心得体会
- [高等教育]小学信息(苗版)第一册全册教案
- 在市---局2010党建大会上的讲话
- 《科哲》提纲及补充阅读材料(2010.7)
- 苏州高博软件技术职业学院论文开题报告
- 兼职导游管理的困境及对策探讨
- 基于通用设计理念的现代厨房产品语义研
- 康乐一中2010年至2011年度鼓号队、花束
- 第10章_数据收集整理与描述_期末复习课
- 2008年黑龙江林甸商贸购物中心营销策划
- 水硬度的测定实验报告
- 五分钟教你拍摄夜景光绘照
- 2014年临床妇产科三基三严试题及答案
- 0第二课 纾解压力第一站了解压力
- 解析建筑工程电气设备安装施工技术要点
- 地方性应用型本科高校“双师型”师资队
- 高考语文专题复习课件:小说阅读指导
- 装饰工程投标书2
- 大学生就业难问题探讨及对策
- English and Its History
- 青岛市城市房屋修缮工程质量监督管理办
- 初中英语形容词和副词的用法和练习题