07_IMPROVE_Steps_7-8-9[68P][8.23MB]
GE Global Research Green Belt DMAIC Course
07: IMPROVE PhaseSteps 7,8, 9: It’s About Improving Processes and Products Using Designed Experiments and Other Tools . . .Fuel Economy
Correct Type II Decision Error (1- a) bType I Error
a
Correct Decision (1- b)
Octane Level
Air TempXbar/S Chart for Evaluations4.3 4.2 4.1 4.0 3.9 3.8 3.7 Subgroup 0 5 1 10 15 1 20 25 3.0SL=4.232 X=4.096 -3.0SL=3.959
X270 60 Y= 50 90 80
Sample Mean
0.6
1
Sample StDev
0.5 0.4 0.3 0.2 0.1 0.0 3.0SL=0.2409 S=0.1403 -3.0SL=0.03982
X1
Ver 2.1 October 2003
Proprietary to General Electric Company
Improve Phase Objectives
The benefits of Design of Experiments (DOE’s) Key concepts and terms associated with DOE’s Performing a simple full factorial and fractional DOE’s and interpreting the results Awareness of screening designs and higher level response surface designsVer 2.1 October 2003 Proprietary to General Electric Company
Table of Contents07: IMPROVE PhaseImprove Phase Steps Improve Phase& Common Tools Design of Experiments Terminology& Advantages 2-Level Factorial Basics– Main Effects and Interaction Plots Randomization& Replication Statistical Significance 2-Factor DOE Example& Analysis Residuals Analysis Testing for Curvature 23 Full Factorial (incl Class Exercise) Fractional Factorials Aliasing (Confounding) Screening Designs Foldover Designs and Blocking Response Surface Analysis - Introduction
Page5 6-7 8-11 12-15 16 17 18-21 22-26 27-31 32-35 36-38 39-41 42-48 49-51 52-54 55-56 57-62 63-65 66 67 3
Indicates Minitab File
R2& Adjusted R2 Response Surface Analysis– Class Exercise - DOE Reminders Setting Tolerances on X’s
GE DMAIC Book Of KnowledgeVer 2.1 October 2003
References If You Leave with SomethingProprietary to General Electric Company
The DMAIC ProcessDefine Tollgate1xx/xx/xx
Measure Tollgate2xx/xx/xx
Analyze Tollgate3xx/xx/xx
Improve Tollgate4xx/xx/xx
Control Tollgate5xx/xx/xx
DEFINE
MEASUREStep 1: Select CTQ Characteristics Step 2: Define Performance Standards Step 3: Measurement System Analysis (MSA)
ANALYZEStep 4: Establish Process Capability Step 5: Define Performance Objectives Step 6: Identify Variation Sources)
IMPPROVEStep 7: Screen Potential Causes Step 8: Discover Variable Relationships Step 9: Establish Operating Tolerances
CONTROLStep`10: Define and Validate the Measurement System on Xs Step 11: Determine Process Capability Step 12: Implement Process Control
Key Steps:
Step A: Identify Project CTQs
Step B: Develop Team Charter
Step C: Define Process Map
Overall Project Completion Percentage
0%70% 80% 90% 100%
10%
20%
30%
40%
50%
60%
Key DeliverablesRequired List of Project CTQs Team Charter High Level Process Map (COPIS or SIPOC) Tools That May Help Project Risk Assessment Stakeholder Analysis High Level Project Plan In Frame/Out of Frame Customer Survey Methods (focus groups, interviews, etc.) Req
uired QFD/CTQ Tree Operational definition, Specification limits, target, defect definition for Project Y(s) Measurement System Analysis Tools That May Help Data Collection Plan Gage R&R Detailed Process Map FMEA Pareto Analysis Required Baseline of Current Process Performance Normality Test Statistical Goal Statement for Project List of Statistically Significant Xs Tools That May Help Benchmarking Fishbone Diagram Box Whisker Plots Hypothesis Testing Regression Analysis Required List of Vital Few Xs Transfer Function(s) Optimal Settings for Xs Confirmation Runs/Results Tolerances on Vital Few Xs Tools That May Help Design of Experiments New Process Maps FMEA on new process Process Modeling Required MSA Results on Xs Post Improvement Capability Statistical Confirmation of Improvements Process Control Plan Process Owner Signoff Tools That May Help Control Charts Hypothesis Testing CAP Plan
Ver 2.1 October 2003
Proprietary to General Electric Company
IMPROVE Phase StepsDefine Measure Analyze Improve
DMAIC
Control
7. Screen Potential Causes Deliverable: Determine the Vital Few X’s That Are Causing Changes in Y.
8. Discover Variable Relationships Deliverable: Establish Transfer Function Between Y and Vital Few X’s. Determine Optimal Setting for the Vital Few X’s. Perform Confirmation Runs.
9. Establish Operating Tolerance Deliverable: Specify Tolerances on the Vital Few X’s.
Tools: Screening DOE
Tools: Factorial Designs
Tools: Simulation
Ver 2.1 October 2003
Proprietary to General Electric Company
What’s Improve Phase About. . . Develop an Improvement Strategy Determine which candidate x’s identified in the Analyze Phase are truly“critical X’s”. If possible, determine a quantitative transfer function that relates your Y to these critical X’s
DMAIC
Identify Improvement Actions Determine optimal settings for the X’s
Y= f(x)
Show the impact of the changes on meeting project or business objectives.
Validate the Improvement Demonstrate the validity of your identified improvement actions via additional experiments or a pilot study
Develop a Plan to Implement the Change It’s More than Just Designed ExperimentsVer 2.1 October 2003 Proprietary to General Electric Company
Common“Improve” ToolsBasic Process Map Fishbone Box Plot Time Order Plots Hypothesis Tests Linear Regression Mistake Proofing
DMAIC
Intermediate DOE Full Factorial Fractional Factorial Intro to Response Surface
Advanced DOE Response Surface Taguchi (Inner/ Outer Array)
Simulation Models Already Covered Covered in Improve Covered in DFSS Adv. Level III e.g. ProModel
Multivariate R …… 此处隐藏:8735字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [教学研究]2012西拉科学校团少队工作总结
- [教学研究]建筑工程公司档案管理制度
- [教学研究]小学数学人教版六年级上册圆的周长和面
- [教学研究]ERP电子行业解决方案
- [教学研究]钢支撑租赁合同范本
- [教学研究]预应力自动张拉系统用户手册Rev1.0
- [教学研究]MOOC课程:金瓶梅人物写真(每章节课后
- [教学研究]追加被执行人申请书(适用追加夫妻关系)
- [教学研究]2014年驾考科目一考试最新题库766
- [教学研究]2013-2014学年度九年级物理第15章《电
- [教学研究]新版中日交流标准日本语初级下26课-客
- [教学研究]小导管注浆施工作业指导书
- [教学研究]一般财务人员能力及人岗匹配评估表
- [教学研究]打1.2.页 小学一年级暑假口算100以内加
- [教学研究]学习贯彻《中国共产党党和国家机关基层
- [教学研究]2012年呼和浩特市中考试卷_35412
- [教学研究]最简易的电线电缆购销合同范本
- [教学研究]如何开展安全标准化建设
- [教学研究]工作分析与人岗匹配
- [教学研究]2016-2017学年高中历史第七单元现代中
- 山东省义务教育必修地方课程小学三年级
- 台湾宜兰大学互联网交换技术课程 01_In
- 思想品德:第一课《我知我家》课件(人
- SAR合成孔径雷达图像点目标仿真报告(附
- 利辛县“十三五”规划研究报告
- 2015-2020年中国手机APP行业市场发展趋
- 广告策略、创意表现、媒体方案
- 企业如何申请专利的的几点思考
- 《中国教育简史》网上作业
- 高中历史第二单元西方人文精神的起源及
- 年终晚会必备_精彩的主持稿_精心整理_
- 信息工程专业自荐书
- 2019高考历史人教版一轮练习:第十二单
- JAVA俱乐部管理系统软件需求规格说明书
- 2016-2021年中国小型板料折弯机行业市
- (人教新课标)六上_比的基本性质课件PPT
- 辽宁省公务员考试网申论备考技巧:名言
- 神经阻滞麻醉知情同意书
- 施工企业信息填报、审核和发布的相关事
- 初一(七年级)英语完形填空100篇




