导读: 4*s1+80*s2+35*s3+25*s4 P2*s2 问题二奶油价格指标限制下的LINGO软件运算结果输出: Local optimal solution found. Objective value: 0.2299855E+10 Total solver iterations: 33 Variable Value Reduced Cost S1

4*s1+80*s2+35*s3+25*s4<60000000; 9*s1+2*s2+30*s3+40*s4<70000000; p2<720;

P2*s2<230400000;

问题二奶油价格指标限制下的LINGO软件运算结果输出:

Local optimal solution found.

Objective value: 0.2299855E+10 Total solver iterations: 33

Variable Value Reduced Cost S1 3374000. 0.000000 P1 519.7500 0.000000 S2 320000.0 0.000000 P2 720.0000 0.000000 S3 209135.3 0.000000 P3 1183.577 0.000000 S4 35532.49 0.000000 P4 1921.932 0.000000

Row Slack or Surplus Dual Price 1 0.2299855E+10 1.000000 2 0.000000 519.7500 3 0.000000 0.000000 4 0.000000 1183.577 5 0.000000 1921.932 6 0.1269595E+08 0.000000 7 0.3129864E+08 0.000000 8 0.000000 0.000000

问题二奶酪1价格指标限制下的LINGO软件程序输入: max=s1*p1+s2*p2+s3*p3+s4*p4;

s1=4820000*(1-0.4*(p1-297)/297); s2=320000*(1-2.7*(p2-720)/720);

s3=210000*(1-1.1*(p3-1050)/1050+0.1*(p4-815)/815); s4=70000*(1-0.4*(p4-815)/815+0.4*(p3-1050)/1050); 4*s1+80*s2+35*s3+25*s4<60000000; 9*s1+2*s2+30*s3+40*s4<70000000; p3<1050;

p3*s3<220500000;

10

问题二奶酪1价格指标限制下的LINGO软件运算结果输出: Local optimal solution found.

Objective value: 0.2310506E+10 Total solver iterations: 30

Variable Value Reduced Cost S1 3340788. 0.000000 P1 524.8662 0.000000 S2 469210.6 0.000000 P2 595.6578 0.000000 S3 210000.0 0.000000 P3 1050.000 0.000000 S4 70000.00 0.000000 P4 815.0000 0.000000

Row Slack or Surplus Dual Price 1 0.2310506E+10 1.000000 2 0.000000 514.6338 3 0.000000 391.0088 4 0.000000 -1715.270 5 0.000000 751.0472 6 0.000000 2.558112 7 0.2989449E+08 0.000000 8 0.000000 72240.12 9 0.000000 2.548320

问题二奶酪2价格指标限制下的LINGO软件程序输入: max=s1*p1+s2*p2+s3*p3+s4*p4;

s1=4820000*(1-0.4*(p1-297)/297); s2=320000*(1-2.7*(p2-720)/720);

s3=210000*(1-1.1*(p3-1050)/1050+0.1*(p4-815)/815); s4=70000*(1-0.4*(p4-815)/815+0.4*(p3-1050)/1050); 4*s1+80*s2+35*s3+25*s4<60000000; 9*s1+2*s2+30*s3+40*s4<70000000; p4<815;

p4*s4<57050000;

问题二奶酪2价格指标限制下的LINGO软件运算结果输出:

11

Local optimal solution found.

Objective value: 0.2310506E+10 Total solver iterations: 21

Variable Value Reduced Cost S1 3340788. 0.000000 P1 524.8662 0.000000 S2 469210.6 0.000000 P2 595.6578 0.000000 S3 210000.0 0.000000 P3 1050.000 0.000000 S4 70000.00 0.000000 P4 815.0000 0.000000

Row Slack or Surplus Dual Price 1 0.2310506E+10 1.000000 2 0.000000 514.6338 3 0.000000 391.0088 4 0.000000 960.4661 5 0.000000 48.84513 6 0.2793968E-08 2.558112 7 0.2989449E+08 0.000000 8 0.000000 32758.26 9 0.000000 0.8615976

12

…… 此处隐藏:194字,全部文档内容请下载后查看。喜欢就下载吧 ……
数学建模 - - 生产规划问题(3).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/443226.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)