1.0 CONCRETE
1.1 Scope
This section covers the supply of materials for concrete, design of concrete mixes,
quality control of concrete, mixing, transporting, placing and curing of concrete,
and testing of concrete.
The standard of materials and workmanship shall not be inferior to the
recommendations of the current:
British Standard 8110 : Structural Use of Concrete
British Standard Code of Practice BS 8007 1987: Design of Concrete Structures for Retaining Aqueous liquids.
Appropriate Malaysian Standards approved by the S.O.
Unless otherwise specified, all reinforced concrete for retaining aqueous liquids
shall comply with BS 8007 and shall be of Grade C35A designed to resist Class 2
Sulphate Conditions as defined in BS 5238: Part 1 Table 7.
1.2 Concrete Production at the Site
At the commencement of the Contract the Contractor shall submit for the approval
of the S.O. a method statement detailing with regard to the requirements of this
Specification his proposal for the organization of concreting activities at the site.
The method statement shall include the following items :-
(a) Plant proposed;
(b) Laying of concrete production facility;
(c) Proposed method of organisation of the concrete production facility;
(d) Quality control procedures for concrete and concrete materials;
(e) Method of transport and placing of concrete;
(f) Striking times for formwork and procedure for temporary support of beams
and slabs.
Certificates
1.3 Test
Unless otherwise directed by the S.O., manufacturer's test sheets shall be supplied
with each consignment of cement and admixture certifying compliance with the
relevant standard.
D:\TECHNICAL DEPARTMENT\SPECIFICATION\SPEC FINAL PDF\PDF New Folder Final\L-Concretework 1-new1.doc L.1
SYABAS’ STANDARD SPECIFICATION FOR PIPE LAYING WOKS
First Edition : May 2007
The Contractor shall also submit to the S.O. certificates of calibration for the
weighing and dispensing equipment on the concrete batch mixing plant, certified
test results for all tests carried out on aggregate, water, fresh concrete and hardened
concrete, all as specified.
Samples
1.4 Aggregate
Prior to the commencement of the trial mixes of concrete the Contractor shall
submit for approval samples 50 kg in weight of each aggregate which he proposes
to use.
The source of each aggregate shall be clearly marked on the container of each
sample.
Certified test results demonstrating compliance with the relevant quality standard
shall be submitted at the same time. Samples approved by the S.O. shall remain
preserved at site for reference.
1.5 Records of Concreting
An accurate and up to date record showing dates, times, weather and temperature
conditions when various sections of the works are concreted shall be kept by the
Contractor and shall be available for inspection by the S.O. The Contractor shall
also record the results of all tests of concrete and shall identify these results with the
parts of the works of which the samples material is representative.
For each grade of concrete, the Contractor shall submit to the S.O., not later than
twenty-four hours after concreting, a daily return of the number of batches mixed,
the number of batches and total volume of concrete placed, the number of batches
wasted or rejected and the weight of cement used.
The return shall also include specific details of each location in the works where
concrete is placed, together with the grade of concrete, total volume of concrete
placed and the number of batches used for each location.
Mixes
1.6 Concrete
At the commencement of the works the Contractor shall design a mix for each grade
of concrete which will be required for use in the works and shall submit full details
of the mix designs to the S.O. for his approval. Each mix design shall be according
to the requirements of BS 5328.
1.7 Construction Joints and Lifts
The Contractor shall submit to the S.O. for his approval, as soon as is practicable
after the acceptance of his tender and not less than three weeks before the
commencement of concreting, drawings showing his proposals for placing concrete
on which the position of all construction joints and lifts shall be shown. No
concreting shall be started until the S.O. has approved the method of placing, the
positions and form of the construction joints and the lifts. The construction joints
shall be located so as to impair the strength of the structure.
D:\TECHNICAL DEPARTMENT\SPECIFICATION\SPEC FINAL PDF\PDF New Folder Final\L-Concretework 1-new1.doc L.2
SYABAS’ STANDARD SPECIFICATION FOR PIPE LAYING WOKS
First Edition : May 2007
Rebates, keys or notches shall be formed and waterstops inserted as the S.O. may
require. The position of construction joints and the size of formwork panels shall be
so coordinated that where possible the line of any construction joint coincides with
the line of a formwork joint and that in any case all construction joint lines and
formwork joint lines appear as a regular and uniform series.
For all exposed horizontal joints and purposely inclined joints, a uniform joint shall
be formed with a batten of approved dimensions to give a straight and neat joint
line.
1.8 Cement
The cement used for any particular mix shall comply with whichever of the
following standar …… 此处隐藏:46212字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [基础教育]2016-2022年中国钢芯铝绞线市场现状调
- [基础教育]语文部编版初一语文下册练习题 句式变
- [基础教育]南京继续教育参考答案--深入学习贯彻习
- [基础教育]国旗下讲话稿——珍惜时间好读书
- [基础教育]北师大版六年级数学下册圆锥的体积教学
- [基础教育]人教版-音乐-四年级下册-四年级下册音
- [基础教育]乔布斯2019年斯坦福大学毕业典礼致辞.d
- [基础教育]2015年加油站安全知识竞赛试题及答案
- [基础教育]2020年教师年度考核个人工作总结
- [基础教育]2019年中考历史试题-2019年大庆市初中
- [基础教育]初三仁爱英语第一轮总复习教案
- [基础教育]SG-A094电气配管安装工程隐蔽验收记录
- [基础教育]冀教版小学数学三年级下册第六单元教材
- [基础教育]青岛版(五制)小学科学二年级下册16《制
- [基础教育]2018-2019年初中科学初一中考真卷测试
- [基础教育]幼儿园大班期末简短评语精选
- [基础教育]2018云南临沧公务员考试申论技巧:这样
- [基础教育]学校食堂经营管理方案
- [基础教育]新中国砥砺奋进的七十年原文
- [基础教育]真空泵的选型及常用计算公式
- 高职田径课程教学现状与对策
- 全髋关节置换术在老年股骨颈骨折患者中
- 青人社厅函〔2016〕576号(附件)工资
- cp101-07砂子检验作业指导书 - secret
- 微观经济学 第八章 博弈论 习题
- 2014高考真题(词语运用)汇编及答案
- 2018年人教版七年级语文下册《第三单元
- 苏教版数学四年级上册第一单元试题 - M
- 四川大学新闻与传播考研2000-2010年真
- 浙江万里学院英语专业四年制本科教学计
- 最新2018马年事业祝福语-范文word版(2
- 最全模具行业术语英文翻译
- 皮亚杰的发展心理学理论
- 64篇高考情景式默写 练习题及答案
- 仿写(学生稿)
- 《SQL Server数据库技术》试卷A
- 第七章作业答案
- 江苏省赣榆县海头高级中学高中语文必修
- 浙江省2001年10月自考正常人体解剖学答
- 2012英语重点短语