沃尔沃汽车流程05-Phased PPAP process VCC CH_EN
VCC Phased PPAP process 沃尔沃汽车Phased PPAP流程
COURSE OVERVIEW 课程概述
This course describes the purpose and applicability of
VCC Phased PPAP
(Production Part Approval Process)
PPAP PPAP order order R@R R@R Ph0+ Ph0+ Ph1/2 Ph1/2 Ph3 Ph3
Section1: General introduction to PPAP/PPPAP简介 Section2: VCC Phased PPAP Introduction VCC阶段PPAP介绍
? ? ? VCC phased PPAP 沃尔沃阶段PPAP Supplier Roles & Responsibilities 供应商角色和职责 Submission to Customer + Exception management 递交客户和让步管理流程
Section3: Phased PPAP Benefits 阶段PPAP的优势
? ? Difference between PPAP & VCC Phased PPAP PPAP和阶段PPAP的差别 Phased PPAP handbook 阶段PPAP手册
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Issue date: 12/Jul/2011, Security Class: Public Page 2
Section 1: General introduction to PPAP PPAP简介
Purpose for this Section: ? PPAP Introduction
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Issue date: 12/Jul/2011, Security Class: Public Page 3
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic
Page 4Issue date: 12/Jul/2011, Security Class: Public
What is PPAP? 什么是PPAP
PPAP stands for
?Production Part Approval Process (PPAP 是生产件批准程序)
PPAP defines
?Generic requirements for production part approval.(PPAP 定义了生产件批准的基本要求)Purpose of PPAP
?is to determine if all customer engineering design records and specification requirements are properly understood by the organization
评估组织是否完全理解客户所有的设计和技术要求
?is to ensure that the manufacturing process has the potential to produce product consistently meeting these requirements during an actual production run at the quoted production rate 保证在确定的产线上有能力生产出稳定的满足客户产品
PPAP shall apply to sites supplying:
?Production and Service parts. (PPAP 适用于生产件和售后件)
The 18 PPAP Elements/PPAP的18项要素
1. Design Records 2. Engineering Change Documents 3. Engineering Approval 4. Design FMEA 5. Process Flow Diagrams 6. Process FMEA 7. Control Plan 8. Measurement System Analysis Studies 9. Dimensional Results 10. Records of Material / Performance Test Results 11. Initial Process Studies 12. Qualified Laboratory Documentation 13. Appearance Approval Report 14. Sample Production Parts 15. Master Sample 16. Checking Aids 17. Customer-Specific Requirements 18. Production Part Approval Process Submission Warrant (PSW)
The above section numbers are in alignment with the AIAG published PPAP 4th Edition Manual
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Issue date: 12/Jul/2011, Security Class: Public Page 5
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic
Page 7Issue date: 12/Jul/2011, Security Class: Public
When is submission of PPAP required?什么时候需要递交PPAP is to be submitted for:
? A new or modified part 任何新的或更改的零件
?Process or material changes 任何工艺和材料的变更
?Correction of a deviation to spec on a previously approved part.对之前的临时认可的产品的更正
?Volume increase or change in supplier capacity.供应商产能的增加或改变?Site Relocation 生产场所的变更
Note that:
?The Supplier must notify VCC using the Supplier Request for Engineering Approval (SREA) or Supplier request for Industrial Change Approval (SRICA)
供应商变更需按照沃尔沃“SREA”或“SRICA”流程进行
?
The Supplier is required to notify the STA Engineer of any changes after initial PPAP approval 有任何初始PPAP 批准后发生的变更,供应商必须通知STA
Section 2: VCC Phased PPAP Introduction 沃尔沃Phased PPAP介绍
Purpose for this Section: ? VCC phased PPAP ? Supplier Roles & Responsibilities 供应商角色和职责 ? Submission to Customer + Exception management
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Issue date: 12/Jul/2011, Security Class: Public Page 8
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic
Page 9Issue date: 12/Jul/2011, Security Class: Public
?VCC Phased PPAP is a VCC approach to PPAP process management VCC Phased PPAP 是VOLVO 管理PPAP 流程的方式
?Introduced to improve launch performance 目的是提高项目启动开发效率?Requires a supplier site to demonstrate 要求供应商的现场满足
?Manufacturing/geometry capability 生产和尺寸稳定的能力
?Product quality 产品质量
?And production capacity 产能要求
?…prior to job #1在job #1之前
?Is derived from the Ford process but is not equal to it. It is important to ensure that the Volvo Car Corporation version is always used for Volvo Car Corporation business as both are NOT interchangeable.
?是从Ford 起源但并不相同,所有VCC 的供应商必须使用VCC 的版本。What is VCC phased PPAP?
VCC PHASED PPAP TIMING 时间节点
PPAP PPAP order order R@R R@R
Run-at-Rate
Ph0+ Ph0+
Phase 0 + Geometry verification
Ph1/2 Ph1/2
Phase 1 Quality Verification Phase 2 Production Verification
Ph3 Ph3
Phase 3 Capacity Verification
Geo Geo++capability capability PV PVtesting/ testing/AAR AAR
R@R
mrd
TT = Tooling Tryout 工装验证 PP = Pilot Production 试生产 mrd = Material Required Date 产品需求日期
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Issue date: 12/Jul/2011, Security Class: Public Page 11
MP1 = Mass Production 1 量产1
VCC Phased PPAP Process_v2, 53200, Andreas Tomic, atomic Page 12Issue date: 12/Jul/2011, Security Class: Public
Timing 时间节点
?
Specific timing dates for PPAP are set by each program team.VCC 项目小组会定义PPAP 的详细时间节点?Suppliers are required to communicate planned PPAP timings that supports the program build mrd dates to the responsible Purchaser.
供应商与对应的采购沟通,获取能满足项目MRD 日期的PPAP 时间节点
–PPAP Phase 0 + geo should be …… 此处隐藏:5675字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [基础教育]2016-2022年中国钢芯铝绞线市场现状调
- [基础教育]语文部编版初一语文下册练习题 句式变
- [基础教育]南京继续教育参考答案--深入学习贯彻习
- [基础教育]国旗下讲话稿——珍惜时间好读书
- [基础教育]北师大版六年级数学下册圆锥的体积教学
- [基础教育]人教版-音乐-四年级下册-四年级下册音
- [基础教育]乔布斯2019年斯坦福大学毕业典礼致辞.d
- [基础教育]2015年加油站安全知识竞赛试题及答案
- [基础教育]2020年教师年度考核个人工作总结
- [基础教育]2019年中考历史试题-2019年大庆市初中
- [基础教育]初三仁爱英语第一轮总复习教案
- [基础教育]SG-A094电气配管安装工程隐蔽验收记录
- [基础教育]冀教版小学数学三年级下册第六单元教材
- [基础教育]青岛版(五制)小学科学二年级下册16《制
- [基础教育]2018-2019年初中科学初一中考真卷测试
- [基础教育]幼儿园大班期末简短评语精选
- [基础教育]2018云南临沧公务员考试申论技巧:这样
- [基础教育]学校食堂经营管理方案
- [基础教育]新中国砥砺奋进的七十年原文
- [基础教育]真空泵的选型及常用计算公式
- 高职田径课程教学现状与对策
- 全髋关节置换术在老年股骨颈骨折患者中
- 青人社厅函〔2016〕576号(附件)工资
- cp101-07砂子检验作业指导书 - secret
- 微观经济学 第八章 博弈论 习题
- 2014高考真题(词语运用)汇编及答案
- 2018年人教版七年级语文下册《第三单元
- 苏教版数学四年级上册第一单元试题 - M
- 四川大学新闻与传播考研2000-2010年真
- 浙江万里学院英语专业四年制本科教学计
- 最新2018马年事业祝福语-范文word版(2
- 最全模具行业术语英文翻译
- 皮亚杰的发展心理学理论
- 64篇高考情景式默写 练习题及答案
- 仿写(学生稿)
- 《SQL Server数据库技术》试卷A
- 第七章作业答案
- 江苏省赣榆县海头高级中学高中语文必修
- 浙江省2001年10月自考正常人体解剖学答
- 2012英语重点短语