全站仪建筑测量外文翻译文献(2)
全站仪建筑测量外文翻译文献
原文:
Application of total station instrument in measuring in
housing construction
Abstract: Application of total station instrument in measuring in housing construction, puts forward some matters needing attention in the use of total station instrument.
Keywords: Total station, housing construction, construction surveying, application
With the development of science and technology, human labor is not only fast in the breadth and depth of development, and more concise and efficient. The emergence of optical rangefinder to greatly improve the measurement range and measurement speed, electronic theodolite appear not only makes the measuring accuracy is improved, the visualization is brought great convenience for measurement, electronic total station is set distance, angle, measuring height and automatic data processing of intelligent instruments in one, widely used in construction survey of high-level, large-scale housing construction. A. Total station.
The total station instrument, namely the total station electronic tacheometer. Is a set of light, machine, electricity as one of the high-tech measuring instruments, is the set of horizontal angle, vertical angle, distance (distance,
6
全站仪建筑测量外文翻译文献
horizontal distance), height measurement functions in one instrument of Surveying and mapping system. The total station instrument has the advantages of high measuring precision, instrument integration, automation and intelligent degree and other advantages, has been widely used in various engineering in construction survey. Total station 3D coordinate measuring system is composed of electronic measurement, electronic distance measuring, computing and data storage unit, the measurement results can be displayed automatically, and multifunctional measuring instrument and equipment trade places. Because the total station electronic tacheometer is perfect to achieve electronic and integration of measurement and process, so people also often referred to as the total station electronic tacheometer or total station. B. Characteristics of two, the total station instrument
1, Total station with its own data processing system, as long as a sighting reflecting prism; can quickly detect horizontal angle, vertical angle and slant range, automatically calculate the coordinates and elevation measurement, and can record the measurement and calculation of data.
2, Through standard communication interface of total station instrument host, can realize data communication electronic total station and computer or other peripheral devices, which makes the measurement data acquisition, management, calculation and drawing form a perfect automatic measurement system.The measurement and calculation to control total station
7
全站仪建筑测量外文翻译文献
3, With total station instrument microprocessor, can realize the meteorological correction, traverse, ago, resection, detail survey and construction lofting calculation task. And because the calculation is done automatically by the total station; i.e. line process is not at all affected by man-made factors.
4, The total station instrument can automatically read distance value, as long as the erecting prism alignment of total station total station instrument lens, we can read the measured distance, and can automatically calculate the theoretical data, with distance automatic and fast characteristics.
5, In the use of coordinate, the angle difference and setting-out length will be shown on the instrument screen, operation is very convenient, especially in leveling, total station a station can complete the traditional level 10 station and 50 station work, than \measuring instruments\can save 2\\/3 time, manpower can be saved 1\\/2.
C. Application of three, the total station instrument in housing construction in the construction survey 1. The composite initial data
The first step is to review the measurement work, city of the proposed building wire around the coordinates and elevation of initial data. At this stage, two test back angle, distance to city traverse points can be a total station
8
全站仪建筑测量外文翻译文献
instrument, measurement data accuracy can meet the measurement requirements, can be used as reference plane control network layout of the project construction and initial data. Specific methods are as follows:
(1) Two N1, N2 selects the city control network. N1 as the test site and on the erection of total station instrument, the N2 as the goal point, erecting prism in the above.
(2) Of the total station of, leveling, and set the parameters of the instrument. (3) The instrument sighting direction value is set to zero. Total station for many times ranging and horizontal angle measurement and display its average value according to the requirements of the times.
In general, covers an area of broad, huge amount of city buildings between initial conductor control data of the distance between the two wires, when the distance of 200-300 meters, using common optical instrument to observe the easy to cause the error, if the observation is not only convenient to use total station, and the precision is high.
2. Through the establishment of plane coordinate control
Plane control network is the basis of building location, its principle is the overall local control, high control precision and low accuracy. Coordinate lofting function using the total station instrument can be accurate, convenient location out of plane control network of the whole building, and then encrypted into
9
全站仪建筑测量外文翻译文献
architectural grid square. The specific methods are as follows:
(1)Aaccording to the construction drawings, calculate the coordinates of the control po …… 此处隐藏:4830字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [政务民生]2013年公共基础知识热点问题(七)
- [政务民生]检验检测机构资质认定评审准则及释义20
- [政务民生]关于印发重庆市房屋建筑和市政基础设施
- [政务民生]1、隧道洞身开挖支护施工技术交底书
- [政务民生]2015年山东省17地市中考语文试题分类汇
- [政务民生]2-高级会计师资格考试和评审流程图
- [政务民生]2018版中国清分机行业发展分析及前景策
- [政务民生]新课改高中政治探究
- [政务民生]2018-2024年中国新型组合房屋行业投资
- [政务民生]2015年上海市春季高考数学模拟试卷五
- [政务民生]灌砂法及环刀法测压实度(带计算过程)
- [政务民生]运筹学实验2求解非线性规划
- [政务民生]劝学、逍遥游默写(教师卷)
- [政务民生]《运筹学》 - 期末考试 - 试卷A - 答案
- [政务民生]八年级英语下册 Module 6 Hobbies测试
- [政务民生]2019年宪法知识竞赛试题库100题(含答
- [政务民生]自动化英文文献翻译
- [政务民生]公文格式实施细则
- [政务民生]高一地理上册课堂跟踪练习题6
- [政务民生]会计继续教育习题及答案
- 第三章 无约束最优化方法
- 泛读教程第三册答案
- 魏晋南北朝文学
- 幂的运算复习题
- 城市环境问题的成因与治理策略_以社会
- 钢结构行业产业链及竞争分析研究
- 新型热塑性弹性体增韧聚丙烯的研究
- 中国旅游地理B卷试题及答案
- (苏教版)五年级数学上册第三单元测试卷
- 不稳定性心绞痛诊断与治疗
- 俞氏国际后勤职能部门绩效考核办法
- GB7258-2017新标准考试题含答案
- 小学生汉字听写比赛活动方案
- 1.3《平抛运动》学案 教科版必修2
- 2011香港特别行政区公务员考试复习资料
- 考虑水力条件变化的城市给水管网可靠性
- 表面活性剂在油田开发和生产中的应用
- ITT内部培训资料-FI端吸泵的介绍
- 文明守纪,从我做起学生发言稿
- 初中读《聊斋志异》心得体会800字范文




